back to
June Testbeam page
June 2016 CERN Testbeam Logbook
Add Log
May 25 9:00 Starting Testbeam preparation at
H6A beam area. Setup HSIO2 and updated Firmare.
--
Koji Nakamura - 2016-05-25
June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK
--
Atlasj Silicon - 2016-06-06
June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato
--
Atlasj Silicon - 2016-06-06
June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (
HsioCosmic _V11N_CosmicNew.bit) by H. Sawai
--
Atlasj Silicon - 2016-06-07
June 7 11:00 Started tuning for irrad-module by H. Sawai
--
Atlasj Silicon - 2016-06-07
June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with
GeoID:31. by H. Sawai
--
Atlasj Silicon - 2016-06-07
June 7 23:47 Started run for 3SCC (no beam yet).
GeoID:31, Run Number:1930~ by H. Sawai
--
Atlasj Silicon - 2016-06-07
June 7 23:52 All sensor tuning done by K.Sato
--
Atlasj Silicon - 2016-06-07
June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai
--
Atlasj Silicon - 2016-06-08
June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato
--
Atlasj Silicon - 2016-06-09
June 10 4:00 check sensor condition,
KEK105RJ3 is out, other sensor install run control. but beam is stopping now...
--
Atlasj Silicon - 2016-06-10
June 10 6:00 beam on & start alignment
--
Atlasj Silicon - 2016-06-10
June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet
--
Atlasj Silicon - 2016-06-11
June 10 morning~June 11 night summary
- 4chip run(KEK105,106,108) alignment OK & start
- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data
- include noise scan mask
- make 4chip run reconstruction program, so please check run quality sometimes
- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30
--
Atlasj Silicon - 2016-06-11
More Information
--
Koji Nakamura - 2016-06-05