June 2016 CERN Testbeam Logbook
Add Log
May 25 9:00 Starting Testbeam preparation at
H6A beam area. Setup HSIO2 and updated Firmare.
--
Koji Nakamura - 2016-05-25
June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK
--
Atlasj Silicon - 2016-06-06
June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato
--
Atlasj Silicon - 2016-06-06
June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (
HsioCosmic _V11N_CosmicNew.bit) by H. Sawai
--
Atlasj Silicon - 2016-06-07
June 7 11:00 Started tuning for irrad-module by H. Sawai
--
Atlasj Silicon - 2016-06-07
June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with
GeoID:31. by H. Sawai
--
Atlasj Silicon - 2016-06-07
June 7 23:47 Started run for 3SCC (no beam yet).
GeoID:31, Run Number:1930~ by H. Sawai
--
Atlasj Silicon - 2016-06-07
June 7 23:52 All sensor tuning done by K.Sato
--
Atlasj Silicon - 2016-06-07
June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai
--
Atlasj Silicon - 2016-06-08
June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato
--
Atlasj Silicon - 2016-06-09
June 10 4:00 check sensor condition,
KEK105RJ3 is out, other sensor install run control. but beam is stopping now...
--
Atlasj Silicon - 2016-06-10
June 10 6:00 beam on & start alignment
--
Atlasj Silicon - 2016-06-10
June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet
--
Atlasj Silicon - 2016-06-11
June 10 morning~June 11 night summary
- 4chip run(KEK105,106,108) alignment OK & start
- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data
- include noise scan mask
- make 4chip run reconstruction program, so please check run quality sometimes
- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30
--
Atlasj Silicon - 2016-06-11
June 11 11:43 telescope1 on onlinemonitor has wrong columns, so power recycle (wrong columns run is 2122,2123)
--
Atlasj Silicon - 2016-06-11
Telescope current up to 3.7A at 14:30.
Power cycle tel LV and restarted Jtag and NI producer.
--
Koji Nakamura - 2016-06-11
It seems tel 1 (second) have issue when current is going up.
--
Koji Nakamura - 2016-06-11
June 11 22:56 check 600V, 400V run beforeGeoID tuning condition & HV change (400V run) start!!!
--
Atlasj Silicon - 2016-06-11
June 12 5:35 changed voltage to 200V -> run beforeGeoID -> run start
--
Atlasj Silicon - 2016-06-12
June 12 9:00 telescope LV current up to 3.3A --> restarted telescope
--
Koji Nakamura - 2016-06-12
June 12 9:30 no DUT hit for run 2175 then restarted rce offline producer. the run just after the issue (run 2177 ) everything looks ok in Online monitor but showing error "Error Section invalid: 4 XXXX XXXX". restarted run just in case.
--
Koji Nakamura - 2016-06-12
June 12 15:08 observe tel current spick at very beginning of spill and telescope stop working. Restarted telescope.
--
Koji Nakamura - 2016-06-12
June 13 9:00 end of 800V run for batch 21
--
Atlasj Silicon - 2016-06-13
June 31 15:15
OnlineMonitor has error message "Event not valid". Check Reconstruction program, this error message event can not reconstruct.
--
Atlasj Silicon - 2016-06-13
June 14 8:30 Started batch22 800V run. Increased LV of KEK103 from 1.3V to 1.4V.
--
Atlasj Silicon - 2016-06-14
June 15 3:00 modified Online Monitor code so that Z axis in all 2D histogram are log scale.
--
Koji Nakamura - 2016-06-15
More Information
--
Koji Nakamura - 2016-06-05