Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

-- Atlasj Silicon - 2016-06-10

June 10 6:00 beam on & start alignment

-- Atlasj Silicon - 2016-06-10

June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet

-- Atlasj Silicon - 2016-06-11

June 10 morning~June 11 night summary

- 4chip run(KEK105,106,108) alignment OK & start

- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data

- include noise scan mask - make 4chip run reconstruction program, so please check run quality sometimes

- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30

-- Atlasj Silicon - 2016-06-11

June 11 11:43 telescope1 on onlinemonitor has wrong columns, so power recycle (wrong columns run is 2122,2123)

-- Atlasj Silicon - 2016-06-11

Telescope current up to 3.7A at 14:30. Power cycle tel LV and restarted Jtag and NI producer.

-- Koji Nakamura - 2016-06-11

It seems tel 1 (second) have issue when current is going up.

-- Koji Nakamura - 2016-06-11

June 11 22:56 check 600V, 400V run beforeGeoID tuning condition & HV change (400V run) start!!!

-- Atlasj Silicon - 2016-06-11

June 12 5:35 changed voltage to 200V -> run beforeGeoID -> run start

-- Atlasj Silicon - 2016-06-12

June 12 9:00 telescope LV current up to 3.3A --> restarted telescope

-- Koji Nakamura - 2016-06-12

June 12 9:30 no DUT hit for run 2175 then restarted rce offline producer. the run just after the issue (run 2177 ) everything looks ok in Online monitor but showing error "Error Section invalid: 4 XXXX XXXX". restarted run just in case.

-- Koji Nakamura - 2016-06-12

June 12 15:08 observe tel current spick at very beginning of spill and telescope stop working. Restarted telescope.

-- Koji Nakamura - 2016-06-12

June 13 9:00 end of 800V run for batch 21

-- Atlasj Silicon - 2016-06-13

June 31 15:15 OnlineMonitor has error message "Event not valid". Check Reconstruction program, this error message event can not reconstruct.

-- Atlasj Silicon - 2016-06-13

June 14 8:30 Started batch22 800V run. Increased LV of KEK103 from 1.3V to 1.4V.

-- Atlasj Silicon - 2016-06-14

Added:
>
>

June 15 3:00 modified Online Monitor code so that Z axis in all 2D histogram are log scale.

-- Koji Nakamura - 2016-06-15

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 202016-06-14 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

-- Atlasj Silicon - 2016-06-10

June 10 6:00 beam on & start alignment

-- Atlasj Silicon - 2016-06-10

June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet

-- Atlasj Silicon - 2016-06-11

June 10 morning~June 11 night summary

- 4chip run(KEK105,106,108) alignment OK & start

- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data

- include noise scan mask - make 4chip run reconstruction program, so please check run quality sometimes

- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30

-- Atlasj Silicon - 2016-06-11

June 11 11:43 telescope1 on onlinemonitor has wrong columns, so power recycle (wrong columns run is 2122,2123)

-- Atlasj Silicon - 2016-06-11

Telescope current up to 3.7A at 14:30. Power cycle tel LV and restarted Jtag and NI producer.

-- Koji Nakamura - 2016-06-11

It seems tel 1 (second) have issue when current is going up.

-- Koji Nakamura - 2016-06-11

June 11 22:56 check 600V, 400V run beforeGeoID tuning condition & HV change (400V run) start!!!

-- Atlasj Silicon - 2016-06-11

June 12 5:35 changed voltage to 200V -> run beforeGeoID -> run start

-- Atlasj Silicon - 2016-06-12

June 12 9:00 telescope LV current up to 3.3A --> restarted telescope

-- Koji Nakamura - 2016-06-12

June 12 9:30 no DUT hit for run 2175 then restarted rce offline producer. the run just after the issue (run 2177 ) everything looks ok in Online monitor but showing error "Error Section invalid: 4 XXXX XXXX". restarted run just in case.

-- Koji Nakamura - 2016-06-12

June 12 15:08 observe tel current spick at very beginning of spill and telescope stop working. Restarted telescope.

-- Koji Nakamura - 2016-06-12

June 13 9:00 end of 800V run for batch 21

-- Atlasj Silicon - 2016-06-13

June 31 15:15 OnlineMonitor has error message "Event not valid". Check Reconstruction program, this error message event can not reconstruct.

-- Atlasj Silicon - 2016-06-13

Added:
>
>

June 14 8:30 Started batch22 800V run. Increased LV of KEK103 from 1.3V to 1.4V.

-- Atlasj Silicon - 2016-06-14

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 192016-06-13 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

-- Atlasj Silicon - 2016-06-10

June 10 6:00 beam on & start alignment

-- Atlasj Silicon - 2016-06-10

June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet

-- Atlasj Silicon - 2016-06-11

June 10 morning~June 11 night summary

- 4chip run(KEK105,106,108) alignment OK & start

- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data

- include noise scan mask - make 4chip run reconstruction program, so please check run quality sometimes

- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30

-- Atlasj Silicon - 2016-06-11

June 11 11:43 telescope1 on onlinemonitor has wrong columns, so power recycle (wrong columns run is 2122,2123)

-- Atlasj Silicon - 2016-06-11

Telescope current up to 3.7A at 14:30. Power cycle tel LV and restarted Jtag and NI producer.

-- Koji Nakamura - 2016-06-11

It seems tel 1 (second) have issue when current is going up.

-- Koji Nakamura - 2016-06-11

June 11 22:56 check 600V, 400V run beforeGeoID tuning condition & HV change (400V run) start!!!

-- Atlasj Silicon - 2016-06-11

June 12 5:35 changed voltage to 200V -> run beforeGeoID -> run start

-- Atlasj Silicon - 2016-06-12

June 12 9:00 telescope LV current up to 3.3A --> restarted telescope

-- Koji Nakamura - 2016-06-12

June 12 9:30 no DUT hit for run 2175 then restarted rce offline producer. the run just after the issue (run 2177 ) everything looks ok in Online monitor but showing error "Error Section invalid: 4 XXXX XXXX". restarted run just in case.

-- Koji Nakamura - 2016-06-12

June 12 15:08 observe tel current spick at very beginning of spill and telescope stop working. Restarted telescope.

-- Koji Nakamura - 2016-06-12

June 13 9:00 end of 800V run for batch 21

Added:
>
>
-- Atlasj Silicon - 2016-06-13

June 31 15:15 OnlineMonitor has error message "Event not valid". Check Reconstruction program, this error message event can not reconstruct.

  -- Atlasj Silicon - 2016-06-13
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 182016-06-13 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

-- Atlasj Silicon - 2016-06-10

June 10 6:00 beam on & start alignment

-- Atlasj Silicon - 2016-06-10

June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet

-- Atlasj Silicon - 2016-06-11

June 10 morning~June 11 night summary

- 4chip run(KEK105,106,108) alignment OK & start

- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data

- include noise scan mask - make 4chip run reconstruction program, so please check run quality sometimes

- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30

-- Atlasj Silicon - 2016-06-11

June 11 11:43 telescope1 on onlinemonitor has wrong columns, so power recycle (wrong columns run is 2122,2123)

-- Atlasj Silicon - 2016-06-11

Telescope current up to 3.7A at 14:30. Power cycle tel LV and restarted Jtag and NI producer.

-- Koji Nakamura - 2016-06-11

It seems tel 1 (second) have issue when current is going up.

-- Koji Nakamura - 2016-06-11

June 11 22:56 check 600V, 400V run beforeGeoID tuning condition & HV change (400V run) start!!!

-- Atlasj Silicon - 2016-06-11

June 12 5:35 changed voltage to 200V -> run beforeGeoID -> run start

-- Atlasj Silicon - 2016-06-12

June 12 9:00 telescope LV current up to 3.3A --> restarted telescope

-- Koji Nakamura - 2016-06-12

June 12 9:30 no DUT hit for run 2175 then restarted rce offline producer. the run just after the issue (run 2177 ) everything looks ok in Online monitor but showing error "Error Section invalid: 4 XXXX XXXX". restarted run just in case.

-- Koji Nakamura - 2016-06-12

June 12 15:08 observe tel current spick at very beginning of spill and telescope stop working. Restarted telescope.

-- Koji Nakamura - 2016-06-12

Added:
>
>

June 13 9:00 end of 800V run for batch 21

-- Atlasj Silicon - 2016-06-13

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 172016-06-12 - KojiNakamura

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

-- Atlasj Silicon - 2016-06-10

June 10 6:00 beam on & start alignment

-- Atlasj Silicon - 2016-06-10

June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet

-- Atlasj Silicon - 2016-06-11

June 10 morning~June 11 night summary

- 4chip run(KEK105,106,108) alignment OK & start

- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data

- include noise scan mask - make 4chip run reconstruction program, so please check run quality sometimes

- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30

-- Atlasj Silicon - 2016-06-11

June 11 11:43 telescope1 on onlinemonitor has wrong columns, so power recycle (wrong columns run is 2122,2123)

-- Atlasj Silicon - 2016-06-11

Telescope current up to 3.7A at 14:30. Power cycle tel LV and restarted Jtag and NI producer.

-- Koji Nakamura - 2016-06-11

It seems tel 1 (second) have issue when current is going up.

-- Koji Nakamura - 2016-06-11

June 11 22:56 check 600V, 400V run beforeGeoID tuning condition & HV change (400V run) start!!!

-- Atlasj Silicon - 2016-06-11

June 12 5:35 changed voltage to 200V -> run beforeGeoID -> run start

-- Atlasj Silicon - 2016-06-12

June 12 9:00 telescope LV current up to 3.3A --> restarted telescope

-- Koji Nakamura - 2016-06-12

June 12 9:30 no DUT hit for run 2175 then restarted rce offline producer. the run just after the issue (run 2177 ) everything looks ok in Online monitor but showing error "Error Section invalid: 4 XXXX XXXX". restarted run just in case.

Added:
>
>
-- Koji Nakamura - 2016-06-12

June 12 15:08 observe tel current spick at very beginning of spill and telescope stop working. Restarted telescope.

  -- Koji Nakamura - 2016-06-12
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 162016-06-12 - KojiNakamura

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

-- Atlasj Silicon - 2016-06-10

June 10 6:00 beam on & start alignment

-- Atlasj Silicon - 2016-06-10

June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet

-- Atlasj Silicon - 2016-06-11

June 10 morning~June 11 night summary

- 4chip run(KEK105,106,108) alignment OK & start

- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data

- include noise scan mask - make 4chip run reconstruction program, so please check run quality sometimes

- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30

-- Atlasj Silicon - 2016-06-11

June 11 11:43 telescope1 on onlinemonitor has wrong columns, so power recycle (wrong columns run is 2122,2123)

-- Atlasj Silicon - 2016-06-11

Telescope current up to 3.7A at 14:30. Power cycle tel LV and restarted Jtag and NI producer.

-- Koji Nakamura - 2016-06-11

It seems tel 1 (second) have issue when current is going up.

-- Koji Nakamura - 2016-06-11

June 11 22:56 check 600V, 400V run beforeGeoID tuning condition & HV change (400V run) start!!!

-- Atlasj Silicon - 2016-06-11

June 12 5:35 changed voltage to 200V -> run beforeGeoID -> run start

-- Atlasj Silicon - 2016-06-12

Added:
>
>

June 12 9:00 telescope LV current up to 3.3A --> restarted telescope

-- Koji Nakamura - 2016-06-12

June 12 9:30 no DUT hit for run 2175 then restarted rce offline producer. the run just after the issue (run 2177 ) everything looks ok in Online monitor but showing error "Error Section invalid: 4 XXXX XXXX". restarted run just in case.

-- Koji Nakamura - 2016-06-12

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 152016-06-12 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

-- Atlasj Silicon - 2016-06-10

June 10 6:00 beam on & start alignment

-- Atlasj Silicon - 2016-06-10

June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet

-- Atlasj Silicon - 2016-06-11

June 10 morning~June 11 night summary

- 4chip run(KEK105,106,108) alignment OK & start

- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data

- include noise scan mask - make 4chip run reconstruction program, so please check run quality sometimes

- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30

-- Atlasj Silicon - 2016-06-11

June 11 11:43 telescope1 on onlinemonitor has wrong columns, so power recycle (wrong columns run is 2122,2123)

-- Atlasj Silicon - 2016-06-11

Telescope current up to 3.7A at 14:30. Power cycle tel LV and restarted Jtag and NI producer.

-- Koji Nakamura - 2016-06-11

It seems tel 1 (second) have issue when current is going up.

-- Koji Nakamura - 2016-06-11

June 11 22:56 check 600V, 400V run beforeGeoID tuning condition & HV change (400V run) start!!!

-- Atlasj Silicon - 2016-06-11

Added:
>
>

June 12 5:35 changed voltage to 200V -> run beforeGeoID -> run start

-- Atlasj Silicon - 2016-06-12

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 142016-06-11 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

-- Atlasj Silicon - 2016-06-10

June 10 6:00 beam on & start alignment

-- Atlasj Silicon - 2016-06-10

June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet

-- Atlasj Silicon - 2016-06-11

June 10 morning~June 11 night summary

- 4chip run(KEK105,106,108) alignment OK & start

- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data

- include noise scan mask - make 4chip run reconstruction program, so please check run quality sometimes

- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30

-- Atlasj Silicon - 2016-06-11

June 11 11:43 telescope1 on onlinemonitor has wrong columns, so power recycle (wrong columns run is 2122,2123)

-- Atlasj Silicon - 2016-06-11

Telescope current up to 3.7A at 14:30. Power cycle tel LV and restarted Jtag and NI producer.

-- Koji Nakamura - 2016-06-11

It seems tel 1 (second) have issue when current is going up.

-- Koji Nakamura - 2016-06-11

Added:
>
>

June 11 22:56 check 600V, 400V run beforeGeoID tuning condition & HV change (400V run) start!!!

-- Atlasj Silicon - 2016-06-11

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 132016-06-11 - KojiNakamura

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

-- Atlasj Silicon - 2016-06-10

June 10 6:00 beam on & start alignment

-- Atlasj Silicon - 2016-06-10

June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet

-- Atlasj Silicon - 2016-06-11

June 10 morning~June 11 night summary

- 4chip run(KEK105,106,108) alignment OK & start

- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data

- include noise scan mask - make 4chip run reconstruction program, so please check run quality sometimes

- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30

-- Atlasj Silicon - 2016-06-11

June 11 11:43 telescope1 on onlinemonitor has wrong columns, so power recycle (wrong columns run is 2122,2123)

-- Atlasj Silicon - 2016-06-11

Added:
>
>

Telescope current up to 3.7A at 14:30. Power cycle tel LV and restarted Jtag and NI producer.

-- Koji Nakamura - 2016-06-11

It seems tel 1 (second) have issue when current is going up.

-- Koji Nakamura - 2016-06-11

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 122016-06-11 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

-- Atlasj Silicon - 2016-06-10

June 10 6:00 beam on & start alignment

-- Atlasj Silicon - 2016-06-10

June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet

-- Atlasj Silicon - 2016-06-11

June 10 morning~June 11 night summary

- 4chip run(KEK105,106,108) alignment OK & start

- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data

- include noise scan mask - make 4chip run reconstruction program, so please check run quality sometimes

- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30

Added:
>
>
-- Atlasj Silicon - 2016-06-11

June 11 11:43 telescope1 on onlinemonitor has wrong columns, so power recycle (wrong columns run is 2122,2123)

  -- Atlasj Silicon - 2016-06-11
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 112016-06-11 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

Deleted:
<
<
 June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

Added:
>
>
June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...
 
Deleted:
<
<
June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...
 -- Atlasj Silicon - 2016-06-10
Deleted:
<
<
 June 10 6:00 beam on & start alignment

-- Atlasj Silicon - 2016-06-10

Added:
>
>
June 11 8:30 5telescope run start (runnumber=2118). Please check run spreadsheet

-- Atlasj Silicon - 2016-06-11

June 10 morning~June 11 night summary

- 4chip run(KEK105,106,108) alignment OK & start

- HSIO2 inlink, outlink config file is incorrect -> change correct config file -> can take beam data

- include noise scan mask - make 4chip run reconstruction program, so please check run quality sometimes

- telescope4 remove June 11 night, because of non event build. -> change 5telescope June 11 8:30

-- Atlasj Silicon - 2016-06-11

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 102016-06-10 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

Added:
>
>
-- Atlasj Silicon - 2016-06-10

June 10 6:00 beam on & start alignment

  -- Atlasj Silicon - 2016-06-10
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 92016-06-10 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

Added:
>
>

June 10 4:00 check sensor condition, KEK105RJ3 is out, other sensor install run control. but beam is stopping now...

-- Atlasj Silicon - 2016-06-10

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 82016-06-09 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

Added:
>
>

June 9 10:04 KEK105,106,108 connectivity check at control room, but tuning is not good...(connecivity is OK) so need to tune in beam line before test by K.Sato

-- Atlasj Silicon - 2016-06-09

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 72016-06-08 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

-- Atlasj Silicon - 2016-06-07

Deleted:
<
<
 June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

Deleted:
<
<
 June 7 23:52 All sensor tuning done by K.Sato

-- Atlasj Silicon - 2016-06-07

Added:
>
>
June 8 23:34 Adjusted position of 3 SCCs, and started run (Run Number:1950~) by H. Sawai

-- Atlasj Silicon - 2016-06-08

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 62016-06-07 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

Added:
>
>
-- Atlasj Silicon - 2016-06-07

June 7 23:47 Started run for 3SCC (no beam yet). GeoID:31, Run Number:1930~ by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 23:52 All sensor tuning done by K.Sato

  -- Atlasj Silicon - 2016-06-07
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 52016-06-07 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

-- Atlasj Silicon - 2016-06-06

June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai

-- Atlasj Silicon - 2016-06-07

June 7 11:00 Started tuning for irrad-module by H. Sawai

Added:
>
>
-- Atlasj Silicon - 2016-06-07

June 7 19:36 Succeeded in remote controlling from the hut. Started 3SCC auto-trigger run with GeoID:31. by H. Sawai

  -- Atlasj Silicon - 2016-06-07
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 42016-06-07 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
Changed:
<
<
back to June Testbeam page
>
>
back to June Testbeam page
 

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

Added:
>
>
June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK
 
Changed:
<
<
June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK
>
>
-- Atlasj Silicon - 2016-06-06
 
Added:
>
>
June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato
 -- Atlasj Silicon - 2016-06-06
Added:
>
>
June 7 10:30 Updated firmware on Artex-7 of IFAE(AFP)'s HSIO2 (HsioCosmic _V11N_CosmicNew.bit) by H. Sawai
 
Changed:
<
<
June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato
>
>
-- Atlasj Silicon - 2016-06-07
 
Changed:
<
<
-- Atlasj Silicon - 2016-06-06
>
>
June 7 11:00 Started tuning for irrad-module by H. Sawai
Added:
>
>
-- Atlasj Silicon - 2016-06-07
 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 32016-06-06 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

Added:
>
>
-- Atlasj Silicon - 2016-06-06

June 6 22:47 check long auto trigger run (about 3h, 3dut & 5tel) -> telescopes & DUT are stable (don't stop run) by K.Sato

  -- Atlasj Silicon - 2016-06-06
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 22016-06-06 - AtlasjSilicon

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

Added:
>
>

June 6 non-irrad sensor tuning start & done, Auto trigger data taking (3dut & 5tel) in beam line -> OK

-- Atlasj Silicon - 2016-06-06

 
<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

Revision 12016-06-05 - KojiNakamura

 
META TOPICPARENT name="June2016CERN"
back to June Testbeam page

June 2016 CERN Testbeam Logbook

Add Log

May 25 9:00 Starting Testbeam preparation at H6A beam area. Setup HSIO2 and updated Firmare.

-- Koji Nakamura - 2016-05-25

<--/commentPlugin-->

More Information

-- Koji Nakamura - 2016-06-05

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback