Difference: Feb2020TestbeamLog (73 vs. 74)

Revision 742020-03-11 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="FermilabTestbeamTop"

Feb 2020 Testbeam Log

Line: 311 to 311
 
    • latency 15: positive signal over than 0.2V events are 5 within 28k events (TLU227, LGAD105)
    • latency 30: positive 4 events within 12k (TLU228, LGAS106)
  • なぜか,channel-22,23,24に変更(EventLoopManager)したら信号(positive)が見えた.(DRS4側では,下のchannelの中の,上から5,6,7番目のchを使った)
Added:
>
>
21:13
  • stage shift (vertical) :344.7mm->349.9mm
  • Quad Lcc off without ROI
  • latency: 250->230
  • busy1ms or 500us.
  • applied noise scan and enmask by analog scan.
  • --> Correlation Lost at 1 spill. this is due to beam rate = beam size?
 

Mar9,2020

7:30

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback