Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 52 to 52 | ||||||||
##run plan## | ||||||||
Changed: | ||||||||
< < | (1) full depletion voltage is different with vendor and ITk. | |||||||
> > | (1) full depletion voltage is different with vendor info and ITk info. | |||||||
(2) tune different way: | ||||||||
Line: 108 to 108 | ||||||||
DUT1 changed 130V(10M) -> 100V(5M) -> 80V(5M) -> 30V(5M) | ||||||||
Added: | ||||||||
> > | so stable beam and DAQ systems.
each batch set is written in detail at ITk Twiki.
sometimes lost correlation.
07 Nov, 2019maybe midnight the XY stage does not work especially Y direction. in the morning, the problem had been resolved already when I knew the problem. restart data taking.08 Nov, 20199:00 clean up config and tunig file in YARR PC is copied at ~/YarrNov in Run Control PC and /eos/atlas/atlascerndisk/pixel-upgrade/itk/TestBeam/desy_2019_november/configlib24. the files do not include *.raw because of no space in Run Control PC. 2 display port - RJ45 adapter were given to Marco. Kyosuke has Linxin's one. | |||||||
-- Koji Nakamura - 2019-11-24
Comments |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 100 to 100 | ||||||||
DUT0 changed 80V -> 100V -> 130V -> 50V -> 10V -> 30V ->130V each with 5M events DUT1 changed 130V -> 100V -> 80V -> 50V -> 30V -> 10V each with 5M events | ||||||||
Added: | ||||||||
> > | 29 Nov,2019DUT0(V2S14) and DUT1(V6S05) tuned 1000e no ToT tuning ,Vff=30 DUT0 changed 75V(10M) -> 80V(5M) -> 50V(5M) ->30V(5M) DUT1 changed 130V(10M) -> 100V(5M) -> 80V(5M) -> 30V(5M) | |||||||
-- Koji Nakamura - 2019-11-24 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 95 to 95 | ||||||||
17:00 changed DUT0 130V and DUT1=129.8V ,1000e, tune V6S02 :DiffVff=50 and V6S04 =50 , No ToT tuning
28 Nov, 2019 | ||||||||
Added: | ||||||||
> > | afternoon :DUT0(V6S02) tuned 1500e ToT and DUT1(V6S04) removed jumpers for grownding DUT0 changed 80V -> 100V -> 130V -> 50V -> 10V -> 30V ->130V each with 5M events DUT1 changed 130V -> 100V -> 80V -> 50V -> 30V -> 10V each with 5M events | |||||||
-- Koji Nakamura - 2019-11-24
Comments |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 93 to 93 | ||||||||
16:30 changed DUT0 100V and DUT1=100V -> double peak... 17:00 changed DUT0 130V and DUT1=129.8V ,1000e, tune V6S02 :DiffVff=50 and V6S04 =50 , No ToT tuning | ||||||||
Added: | ||||||||
> > | 28 Nov, 2019 | |||||||
-- Koji Nakamura - 2019-11-24 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 82 to 82 | ||||||||
debug 50x50 vendor6 modules, but cannot | ||||||||
Added: | ||||||||
> > | 15:45 tune V6S02 : DiffVff =1 and V6S04 : DiffVff =1 (default Vff=50) , No ToT tuning 16:00 tune V6S02 : DiffVff =30 and V6S04 : DiffVff =30 , No ToT tuning 16:10 tune V6S02 : DiffVff =50 and V6S04 : DiffVff =50 , No ToT tuning-> default Diffvff=50 and tuned Diffvff=50 were not result 16:15 did digital scan for return default , and made new configfile->but not 1500e (in fact near 1650e) 16:30 changed DUT0 100V and DUT1=100V -> double peak... 17:00 changed DUT0 130V and DUT1=129.8V ,1000e, tune V6S02 :DiffVff=50 and V6S04 =50 , No ToT tuning | |||||||
-- Koji Nakamura - 2019-11-24
Comments |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 30 to 30 | ||||||||
the cuurent droped to 0 when apply some modules of vendor2 and vendor6 with connencting to YARR. (when extract display pot cable the problem did not occur) try to connect PC GND and LV GND, PC GND and HV GND, but the problem did not resolved. | ||||||||
Changed: | ||||||||
< < | 26 Nov | |||||||
> > | 26 Nov, 2019 | |||||||
9:00 maybe the promble was due to Single Chip Card? | ||||||||
Line: 45 to 44 | ||||||||
(5) module connect with HV and DisplayPort and LV (ON). HV GND and YARR GND short -> stable 20nA@-80V | ||||||||
Changed: | ||||||||
< < | jumper connecter whom name HV and GND added which (maybe) select short with HV and sensor, HV and LV. short sensor GND - HV GND - LV GND, and short YARR - LV GND. | |||||||
> > | add jumper pin which select short with HV and bias ring. (near HV Lemo connector), and short with HV GND and bias ring. | |||||||
--> stable current !! | ||||||||
Line: 75 to 74 | ||||||||
17:00 run start : DUT0:V6S02, DUT1:V6S04, both-130V, 1500e, ToT tuning ON, 10M events | ||||||||
Added: | ||||||||
> > | 27 Nov, 20199:00 stack... 10:30 tune modules with -100V, NO ToT tuning. (other parameters are same) debug 50x50 vendor6 modules, but cannot | |||||||
-- Koji Nakamura - 2019-11-24
Comments |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 73 to 73 | ||||||||
15:30 modify the stage for beam hitting sensor of RD53A as looking the monitor. | ||||||||
Added: | ||||||||
> > | 17:00 run start : DUT0:V6S02, DUT1:V6S04, both-130V, 1500e, ToT tuning ON, 10M events | |||||||
-- Koji Nakamura - 2019-11-24
Comments |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 67 to 67 | ||||||||
11:30 tune V6S04 : same parameters. | ||||||||
Added: | ||||||||
> > | 14:00 run control PC setup especcially editing config files. work DAQ PC from runControlPC. 14:30 first beam out 15:30 modify the stage for beam hitting sensor of RD53A as looking the monitor. | |||||||
-- Koji Nakamura - 2019-11-24
Comments |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 63 to 63 | ||||||||
3. target threshold:1000, ??? | ||||||||
Added: | ||||||||
> > | 11:00?? tune V6S02 : first target:2000, second target:1500, injection:10000, ToT:7, including ToT tuning 11:30 tune V6S04 : same parameters. | |||||||
-- Koji Nakamura - 2019-11-24
Comments |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 27 to 27 | ||||||||
apply voltage on V6S03/4, the current is so high (-50V/100uA over) | ||||||||
Added: | ||||||||
> > | the cuurent droped to 0 when apply some modules of vendor2 and vendor6 with connencting to YARR. (when extract display pot cable the problem did not occur) try to connect PC GND and LV GND, PC GND and HV GND, but the problem did not resolved. 26 Nov 9:00 maybe the promble was due to Single Chip Card? (1) module connect with only HV -> stable, 10(?)nA@-80V (2) module connect with HV and DiplayPort -> unstable:often drop to 0 A (3) module connect with HV and DisplayPort and LV power supply (ON) -> unstable (4) module connect with HV and DisplayPort and LV (ON). LV GND and YARR GND short -> unstable (5) module connect with HV and DisplayPort and LV (ON). HV GND and YARR GND short -> stable 20nA@-80V jumper connecter whom name HV and GND added which (maybe) select short with HV and sensor, HV and LV. short sensor GND - HV GND - LV GND, and short YARR - LV GND. --> stable current !! re-setup ##run plan## (1) full depletion voltage is different with vendor and ITk. (2) tune different way: 1.target threshold:1500, include ToT tuning 2.target threshold:1500, NOT including ToT tuning for disappearing living analog core pattern. 3. target threshold:1000, ??? | |||||||
-- Koji Nakamura - 2019-11-24
Comments |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 15 to 15 | ||||||||
14:00 setup | ||||||||
Changed: | ||||||||
< < | (Lingxin modifed a program for yarr memory leak ) | |||||||
> > | move last TB config file (ex.V2Sxx.json) to Sep2019_2 directory make new connectivity config file:vendor6.json. and install V6S04/5. V6S05 is difficult to pass config. so exchange V6S05 to V6S03. 18:00 complete setup and checked digital/analog scan install new version YarrEudaqProducer modified for memory leak problem. change the symbolic link of YarrEudaqProducerMulti from 201907xx to 20191126 apply voltage on V6S03/4, the current is so high (-50V/100uA over) | |||||||
-- Koji Nakamura - 2019-11-24
Comments | ||||||||
Deleted: | ||||||||
< < | ||||||||
\ No newline at end of file | ||||||||
Added: | ||||||||
> > | ||||||||
\ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Log | ||||||||
Added: | ||||||||
> > | Nov 25 ,2019 | |||||||
Changed: | ||||||||
< < | Article text. | |||||||
> > | 9:30 could not receive DACHS card at bld.6 (Because My name was not in the database.) 10:30 registered my name in the database at bld.6 room 208 11:30 received DACHS card 13:00 safety training(listen and sign name,no test) 14:00 setup (Lingxin modifed a program for yarr memory leak ) | |||||||
-- Koji Nakamura - 2019-11-24 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Added: | ||||||||
> > |
LogArticle text. -- Koji Nakamura - 2019-11-24Comments |