Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
LogNov 25 ,2019 | ||||||||
Line: 52 to 52 | ||||||||
##run plan## | ||||||||
Changed: | ||||||||
< < | (1) full depletion voltage is different with vendor and ITk. | |||||||
> > | (1) full depletion voltage is different with vendor info and ITk info. | |||||||
(2) tune different way: | ||||||||
Line: 108 to 108 | ||||||||
DUT1 changed 130V(10M) -> 100V(5M) -> 80V(5M) -> 30V(5M) | ||||||||
Added: | ||||||||
> > | so stable beam and DAQ systems.
each batch set is written in detail at ITk Twiki.
sometimes lost correlation.
07 Nov, 2019maybe midnight the XY stage does not work especially Y direction. in the morning, the problem had been resolved already when I knew the problem. restart data taking.08 Nov, 20199:00 clean up config and tunig file in YARR PC is copied at ~/YarrNov in Run Control PC and /eos/atlas/atlascerndisk/pixel-upgrade/itk/TestBeam/desy_2019_november/configlib24. the files do not include *.raw because of no space in Run Control PC. 2 display port - RJ45 adapter were given to Marco. Kyosuke has Linxin's one. | |||||||
-- Koji Nakamura - 2019-11-24
Comments |