Difference: Nov2019DESYTBlog (12 vs. 13)

Revision 132019-12-08 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Nov2019DESYTestbeam"

Log

Nov 25 ,2019

Line: 52 to 52
  ##run plan##
Changed:
<
<
(1) full depletion voltage is different with vendor and ITk.
>
>
(1) full depletion voltage is different with vendor info and ITk info.
  (2) tune different way:
Line: 108 to 108
  DUT1 changed 130V(10M) -> 100V(5M) -> 80V(5M) -> 30V(5M)
Added:
>
>
so stable beam and DAQ systems.

each batch set is written in detail at ITk Twiki.

sometimes lost correlation.

07 Nov, 2019

maybe midnight the XY stage does not work especially Y direction. in the morning, the problem had been resolved already when I knew the problem.

restart data taking.

08 Nov, 2019

9:00 clean up

config and tunig file in YARR PC is copied at ~/YarrNov in Run Control PC and /eos/atlas/atlascerndisk/pixel-upgrade/itk/TestBeam/desy_2019_november/configlib24. the files do not include *.raw because of no space in Run Control PC.

2 display port - RJ45 adapter were given to Marco. Kyosuke has Linxin's one.

 -- Koji Nakamura - 2019-11-24