July 2019 DESY Testbeam log pageJuly 22, 20198:00 breakfast meeting with Andre 8:40 registered DACHS card at bld. 6 9:30 received DACHS card 13:00 safety training (only listen, no test) | ||||||||
| Changed: | ||||||||
| < < | 15:00 setup | |||||||
| > > | 15:00 setup (there were many problem) | |||||||
| Changed: | ||||||||
| < < | about setup | |||||||
| > > | 24:00 completed YARR system setup | |||||||
| Added: | ||||||||
| > > | July 23, 2019 | |||||||
| Added: | ||||||||
| > > | 1:00 YARR producer lauched.
1:30 RunControl PC could communicate with NI crate (telescope)
2:00 Norway 3D module did not work. it did not give signal.
3:00 revealed that RunControl PC could not communicate with YARR producer. (YARR producer did not accept orders from RC PC.)
10:00 the above issues is resolved. we were able to go with combines telescope + FEI4 system into auto trigger run.
16:00 issues about communication with RC PC and BDAQ is resolved. But issue about Event Build happened. It was that the data from BDAQ is different with data by making from Event Build.)
YARR system | |||||||
| constraction YARR system login user:testbeam | ||||||||
| Changed: | ||||||||
| < < | the YARR pc IP address -> 192.168.22.199 | |||||||
| > > | the YARR PC IP address -> 192.168.22.199 | |||||||
| Changed: | ||||||||
| < < | ( BDAQ IP -> 192.168.22.198 ) | |||||||
| > > | ( BDAQ PC IP -> 192.168.22.198 ) | |||||||
|
( Run Control PC IP -> 192.168.22.1 )
( NI crate IP -> 192.168.22.2 )
install new software ( https://yarr.readthedocs.io/en/latest/install/ | ||||||||
| Added: | ||||||||
| > > |
if it happend some problems, confirm seup. I wrote especcially careful things. when regulator mode...
set producer, communicate with Run Control PCHow to set YARR producer read "README.md @~/work/yarr_rd53a/YarrEudaqProducer_20190722/ communicate with Run Control PC (The HOSTNAME variable needs to be set) Run Control PCが命令を出すと,YARR producerがdescript? figure?を書き,memoryがoverして動作が重くなった. ->?? Can NOT communicate BDAQ producer and RunControl PCmemo | |||||||
producer, communication between run control PC and BDAQ PC
cards for read out some module by creating Nakamura working test
multi module working test
-- Comments | ||||||||