Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
July 2019 DESY Testbeam log page | ||||||||
Line: 109 to 110 | ||||||||
16:30 beam on -> KEK53-17 hitmap is no signal@-200V -> apply -400V -> hitmap can be seen and reveal bump peel off 18:00 KEK Batch5 run start | ||||||||
Added: | ||||||||
> > | July 28, 20198:30 finished taking data on threshold 1500 (KEK53-13 & 17) 9:00 changed threshold 1000 and tune | |||||||
YARR systemintroduction of YARR | ||||||||
Line: 117 to 123 | ||||||||
login user:testbeam | ||||||||
Changed: | ||||||||
< < | the YARR PC IP address -> 192.168.22.199 ( BDAQ PC IP -> 192.168.22.198 ) ( Run Control PC IP -> 192.168.22.1 ) ( NI crate IP -> 192.168.22.2 ) | |||||||
> > | give each PC IP address
| |||||||
download and install new software ( https://yarr.readthedocs.io/en/latest/install/ ) |