July 2019 DESY Testbeam log pageJuly 22, 20198:00 breakfast meeting with Andre 8:40 registered DACHS card at bld. 6 9:30 received DACHS card 13:00 safety training (only listen, no test) 15:00 setup (there were many problem) 24:00 completed YARR system setupJuly 23, 20191:00 YARR producer lauched. 1:30 RunControl PC could communicate with NI crate (telescope) 2:00 Norway 3D module did not work. it did not give signal. 3:00 revealed that RunControl PC could not communicate with YARR producer. (YARR producer did not accept orders from RC PC.) 10:00 the above issues is resolved. we were able to go with combines telescope + FEI4 system into auto trigger run. 16:00 issues about communication with RC PC and BDAQ is resolved. But issue about Event Build happened. It was that the data from BDAQ is different with data by making from Event Build.) 17:00 confirm whether KEK53-9 by using BDAQ system work 18:00 instead of Norway 3D module, installed KEK53-13 into cooling box. 19:30 exchange YARR PC to our laptop PC because YARR PC memory is too small to work properly. copy config file from YARR PC to that one. but could not download YarrEudaqProducer. 21:30 reload dry ice. temperature ~-1℃ -> -33℃ 22:00 KEK53-13 tuning by using BDAQ. for tuning, supply KEK53-13 High Voltage=-200V.July 24, 20192:00? could not catch signal from BDAQ system. so data taking by YARR system. but the data is not normal(?). | ||||||||
| Changed: | ||||||||
| < < | 22:00 Run Control PCからremote controlできなくなった.<- UPS?が全て落ちていた. | |||||||
| > > | 22:00 could not remote control from Run Control PC. because of shatdown of all UPS(?). | |||||||
| 22:30 data taking used YARR system connecting KEK53-9 applied -50 V (0.034uA). Run120~132. 23:30 stage which is boarded cooling box had been gone down. | ||||||||
| Added: | ||||||||
| > > | ||||||||
July 25, 2019 | ||||||||
| Changed: | ||||||||
| < < | 14:00 workshop:How to reconstract by using EUTelescope. | |||||||
| > > | 6:00 wrote Mr.Mareike | |||||||
| Added: | ||||||||
| > > |
This is how far we went with the FE-I4 Batch: The sensors are mounted, talking and tuned. Everything works.... But when we wanted to adjust the beam position in the sensor, suddenly the PI-Stage moved unstoppable down and we are not able to get the PI-Stage running again, because there is nothing about this issue in the wiki (only a not working link). So next steps would be to adjust the box position in the way, that there is a correlation visible from the reference to one of the sensors that covers the complete column range: So that reference and DUT are in x perfectly aligned and I can investigate the complete column range. The init and configs are already prepared. If your plans in the morning foresee a change of batches back to RD53a, you can just remove my samples and put them back to the fridge.14:00 workshop:How to reconstract by using EUTelescope | |||||||
July 26, 2019 | ||||||||
| Changed: | ||||||||
| < < | 9:00 workshop:about TBmon2. | |||||||
| > > | 8:00 Mr.Koji wrote | |||||||
| Added: | ||||||||
| > > | Quick summary for the night shift :
1) continued data taking with Dortmund 2xFE-I4 modules.
--> finished 4 HV point around 4:30am
2) Yarr multi-module readout has been installed and tested.
--> finally we could manage to run two RD53A module with one yarr
board. (ohio port A and C were used and port D for TLU). We could see
correlation for both modules (attaching usual correlation plots in the
online monitor rd53a1-rd53a2 and rd53a1-FE-I4ref), running already more
than one hours with multiple run-restart, we see correlation all the time.
9:00 workshop:about TBmon2 for reconstraction
July 27, 2019 | |||||||
YARR system | ||||||||
| Changed: | ||||||||
| < < | constraction YARR system | |||||||
| > > | constraction of YARR system | |||||||
login user:testbeam
the YARR PC IP address -> 192.168.22.199
( BDAQ PC IP -> 192.168.22.198 )
( Run Control PC IP -> 192.168.22.1 )
( NI crate IP -> 192.168.22.2 )
install new software ( https://yarr.readthedocs.io/en/latest/install/$ source /opt/Xilinux/Vivado/2016.02/settings64.sh
$ python flash.sh (@ ~/work/yarr_rd53a/YARR-FW(Yarr is a symbolic link with Yarr-fw_20190722)/script)
select #6 (rd53a_ohio_3chip_1tlu_xpressk7_160.bit)
if finish, $ reboot.
$ ./bin/scanConsole -r configs/controller/specCfg.json -c configs/connectivity/example_rd53a_setup.json -s configs/scans/rd53a/std_digitalscan.json -p (@ ~/work/yarr_rd53a/Yarr) <- this is like rd53a_test
if some problems happened, check below things.this is when regulator mode working.
$ ./scripts/tune_rd53a.sh 1500 1500 10000 10 configs/controller/specCfg.json configs/connectivity/example_rd53a_setup.json
wait for 15~20min. if finish, do noise scan.
$ ./primlist/scan53.sh noisescan KEK53-9 -m 1
$ ./primlist/scan53.sh noisescan KEK53-9
RD53A tuning finish!!
set producer, communicate with Run Control PCHow to set YARR producer read "README.md @~/work/yarr_rd53a/YarrEudaqProducer_20190722/ communicate with Run Control PC (The HOSTNAME variable needs to be set) Run Control PCが命令を出すと,YARR producerがdescript? figure?を書き,memoryがoverflowして動作が重くなった. ->YARR producerを立てるPCを,Desktop->Laptopに変更した. ->Laptopで,Euteleproducerのsoftwareをうまくダウンロードできなかった ->Euteleproducerが問題で,その問題解決と同時にdiscriptionを書かないように修正 ->producerのPCをDesktopに変更した Can NOT communicate BDAQ producer and RunControl PCBDAQHow to tune RD53A by using BDAQ systemTLU tutrialinstall and setup software. please refer https://twiki.cern.ch/twiki/bin/view/Atlas/ITkPixelTestBeamReconstruction$ mkdir work
$ ln work /afs/cern.ch/work/?/[user name]
you work in the "work" directory
$ wget https://cernbox.cern.ch/index.php/s/KofU5oNLeGDQHGA/download?x-access-token=eyJhbGciOiJIUzI1NiIsInR5cCI6IkpXVCJ9.eyJkcm9wX29ubHkiOmZhbHNlLCJleHAiOiIyMDE5LTA3LTI1VDIxOjUzOjIwLjEyNzMwMjg1NyswMjowMCIsImV4cGlyZXMiOjAsImlkIjoiMTY1NTQxIiwiaXRlbV90eXBlIjowLCJtdGltZSI6MTU1MTEwNjk3Mywib3duZXIiOiJzdGVyem8iLCJwYXRoIjoiZW9zaG9tZS1zOjQ1MDAzODUyNzM4NDYxNjk2IiwicHJvdGVjdGVkIjpmYWxzZSwicmVhZF9vbmx5Ijp0cnVlLCJzaGFyZV9uYW1lIjoiaW5zdGFsbF9ldXRlbGVzY29wZS5zaCIsInRva2VuIjoiS29mVTVvTkxlR0RRSEdBIn0.0chS7LWzcuxH7nh585DS7hWXTD_z5-UikMi4mOwxlmg$ source install_telescope.sh (for 40min?)
$ source ilcsoft/v01-19-02/Eutelescope/v2.0.0/build_env.sh (build environment)
$ source setup.sh
(good idea : add build_env.sh into setup.sh)
=$ wget https://cernbox.cern.ch/index.php/s/7KbNZEtbrgqSVhD/download?x-access-token=eyJhbGciOiJIUzI1NiIsInR5cCI6IkpXVCJ9.eyJkcm9wX29ubHkiOmZhbHNlLCJleHAiOiIyMDE5LTA3LTI1VDIyOjA1OjE1LjYzMzc4ODA2KzAyOjAwIiwiZXhwaXJlcyI6MCwiaWQiOiIxNjU1NDIiLCJpdGVtX3R5cGUiOjAsIm10aW1lIjoxNTUxMTA3MDEzLCJvd25lciI6InN0ZXJ6byIsInBhdGgiOiJlb3Nob21lLXM6Mjk3Nzc4OTU0NDIzNTAwODAiLCJwcm90ZWN0ZWQiOmZhbHNlLCJyZWFkX29ubHkiOnRydWUsInNoYXJlX25hbWUiOiJjaGFuZ2VSRDUzQWdlby5zaCIsInRva2VuIjoiN0tiTlpFdGJyZ3FTVmhEIn0.aftGeKo6jgWQ86QIzhgRSdIx2BcETUkjayDEyi2i408===-O chargeRD53Ageo.sh
$ source chargeRD53Ageo.sh
$ wget https://cernbox.cern.ch/index.php/s/fNLtd3l8LyE5WdO/download?path=%2F&x-access-token=eyJhbGciOiJIUzI1NiIsInR5cCI6IkpXVCJ9.eyJkcm9wX29ubHkiOmZhbHNlLCJleHAiOiIyMDE5LTA3LTI1VDIyOjA5OjQwLjMzMjA4MTMwOCswMjowMCIsImV4cGlyZXMiOjAsImlkIjoiMTkzNjIzIiwiaXRlbV90eXBlIjoxLCJtdGltZSI6MTU2Mzg5NjM2OSwib3duZXIiOiJtd2VlcnMiLCJwYXRoIjoiZW9zaG9tZS1tOjIxNzIzMzg5IiwicHJvdGVjdGVkIjpmYWxzZSwicmVhZF9vbmx5Ijp0cnVlLCJzaGFyZV9uYW1lIjoiRVVUZWxXb3Jrc2hvcCIsInRva2VuIjoiZk5MdGQzbDhMeUU1V2RPIn0.s0AIhyq2RYlr7xIxbzdj64UYdyP-KNpBFBddqAs0clM&files=GBL_RD53a.tar.gz
$ tar -zxvf GBL_RD53a.tar.gz
$ cd GBL_RD53a
$ mkdir output, raw
$ cd output
$ mkdir database, histograms, lcio, steering
$ emacs -nw config.cfg
$ jobsub -c config.cfg -csv runlist.csv XXXX YYY
$ cd output/histgrams
$ root -l run000YYY-XXXX-histo.root
root[ ] new TBrowser
you can check histgrams.
install TBmon2
=$ git clone https://gitlab.cern.ch/mweers/tbmon2.git===$ cd tbmon2/config/DUT/
go https://cernbox.cern.ch/index.php/s/fNLtd3l8LyE5WdO?path=%2FTBMon2%20Configs$ wget "https://cernbox.cern.ch/index.php/s/fNLtd3l8LyE5WdO/download?path=%2FTBMon2%20Configs&x-access-token=eyJhbGciOiJIUzI1NiIsInR5cCI6IkpXVCJ9.eyJkcm9wX29ubHkiOmZhbHNlLCJleHAiOiIyMDE5LTA3LTI2VDEyOjI3OjAyLjk1NTc1NzYxOCswMjowMCIsImV4cGlyZXMiOjAsImlkIjoiMTkzNjIzIiwiaXRlbV90eXBlIjoxLCJtdGltZSI6MTU2Mzg5NjM2OSwib3duZXIiOiJtd2VlcnMiLCJwYXRoIjoiZW9zaG9tZS1tOjIxNzIzMzg5IiwicHJvdGVjdGVkIjpmYWxzZSwicmVhZF9vbmx5Ijp0cnVlLCJzaGFyZV9uYW1lIjoiRVVUZWxXb3Jrc2hvcCIsInRva2VuIjoiZk5MdGQzbDhMeUU1V2RPIn0.E8B7FJDlk0yNZp4a-RbBdlWKwQQftd7gzJIXG11K9j4&files=RD53a-25-100.cfg" -O RD53a-25-100.cfg
$ wget "https://cernbox.cern.ch/index.php/s/fNLtd3l8LyE5WdO/download?path=%2FTBMon2%20Configs&x-access-token=eyJhbGciOiJIUzI1NiIsInR5cCI6IkpXVCJ9.eyJkcm9wX29ubHkiOmZhbHNlLCJleHAiOiIyMDE5LTA3LTI2VDEyOjM5OjEyLjY2MDE4NDcyNiswMjowMCIsImV4cGlyZXMiOjAsImlkIjoiMTkzNjIzIiwiaXRlbV90eXBlIjoxLCJtdGltZSI6MTU2Mzg5NjM2OSwib3duZXIiOiJtd2VlcnMiLCJwYXRoIjoiZW9zaG9tZS1tOjIxNzIzMzg5IiwicHJvdGVjdGVkIjpmYWxzZSwicmVhZF9vbmx5Ijp0cnVlLCJzaGFyZV9uYW1lIjoiRVVUZWxXb3Jrc2hvcCIsInRva2VuIjoiZk5MdGQzbDhMeUU1V2RPIn0.ivOzKhKncZCE9V8NM42l1BCI2oYBLx_Ajprb32hr5Sg&files=RD53a-50-50.cfg" -O RD53a-50-50.cfg
$ cd ../../ (@tbmon2
$ ./tbmon2 recowork/
$ emacs -nw recowork/config/mainConfig.cfg
| ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
$ emacs -nw recowork/config/analysisConfig.cfg
$ emacs -nw preprocess/src/EuBuildTrack.cc
$ cd lib/libconfig-1.4.9
$ ./configure
$ make
$ cd ../../
$ make
$ ./tbmon2 recowork/
$ root -l recowork/tbtrack???.root
memoproducer, communication between run control PC and BDAQ PC cards for read out some module by creating Nakamura working test multi module working test --Comments
| ||||||||