Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 196 to 196 | ||||||||
-- Atlasj Silicon - 2016-08-22 | ||||||||
Changed: | ||||||||
< < | 8/22 9:30 for batch 22(RJ2 run, geoID118), moved the box 20mm "Down" | |||||||
> > | 8/22 9:30 for batch 22(RJ2 run, geoID118), moved the box 20mm "Down" | |||||||
-- Atlasj Silicon - 2016-08-22 | ||||||||
Line: 217 to 212 | ||||||||
-- Atlasj Silicon - 2016-08-22 | ||||||||
Changed: | ||||||||
< < | 8/22 18:21 beam intensity ~ 25% until tomorrow. -> beam collimator changes 6mm to 10mm, so event rate ~ 7600 per spil | |||||||
> > | 8/22 18:21 beam intensity ~ 25% until tomorrow. -> beam collimator changes 6mm to 10mm, so event rate ~ 7600 per spill | |||||||
-- Atlasj Silicon - 2016-08-22 |