8/15 Tuning & noise scan for (irradiated sensor) KEK109~111, (non-irradiated sensor) KEK112, and (reference plane) KEK82,83,94 ...done.
-- Atlasj Silicon - 2016-08-16
8/16 22:00~ Angle run alignment & daq start at H6B
-- Atlasj Silicon - 2016-08-16
8/17 16:00 threshold has changed. (by temperature ?) -> re-tune
-- Junki Suzuki - 2016-08-17
8/17 18:49 too many leakage current ~-200uA@-200V (KEK109,110,111) and current limit(HV line) does not work.
-- Junki Suzuki - 2016-08-17
8/17 19:00 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (200,200,200,50,300) [V] I_leak start (194,202,276,0,0) [uA]
-- Junki Suzuki - 2016-08-17
8/17 19:17 and_mask=7 ~4600 events/spill
-- Junki Suzuki - 2016-08-17
8/17 19:17 and_mask=3 ~7500 events/spill
-- Junki Suzuki - 2016-08-17
8/17 19:17 and_mask=12 ~2300 events/spill
-- Junki Suzuki - 2016-08-17
8/17 19:17 set "and_mask -> 3", run start
-- Junki Suzuki - 2016-08-17
8/17 19:33 Alignment start stage forward -> 10mm
-- Junki Suzuki - 2016-08-17
8/17 19:38 Alignment start stage forward -> 20mm
-- Junki Suzuki - 2016-08-17
8/17 20:00 Alignment start stage up -> 10mm
-- Atlasj Silicon - 2016-08-17
8/17 20:07 I_leak (43,35,45,0,0) [uA] @-58degC
-- Atlasj Silicon - 2016-08-17
8/17 20:19 Alignment start stage forward -> 40mm
-- Atlasj Silicon - 2016-08-17
8/17 20:27 Alignment start stage back -> 80mm
-- Atlasj Silicon - 2016-08-17
8/17 20:31 Alignment start stage down -> 30mm
-- Atlasj Silicon - 2016-08-17
8/17 20:56 HV OFF (KEK109,110,111)
-- Atlasj Silicon - 2016-08-17
8/17 21:12 Alignment stage down -> 40mm forward -> 40mm up -> 40mm forward -> 10mm back -> 20mm back -> 10mm forward -> 5mm
-- Junki Suzuki - 2016-08-17
8/18 0:30 increased temperature setpoint to 10 degrees
-- Atlasj Silicon - 2016-08-17
8/18 4:30 HV of KEK110 can only be increased up to about 30V. Started run with 0V.
-- Atlasj Silicon - 2016-08-18
for batch22(RJ2 run), moved the box 17mm "Down"
-- Atlasj Silicon - 2016-08-18
for batch23(RJ1 run), moved the box about 23mm "Backward" (Since there was a happening of moving the box too much Forward, the box stopped while moving. Don't know the exact position of box right now.)
-- Atlasj Silicon - 2016-08-18
No beam from around 7:20.
-- Atlasj Silicon - 2016-08-18
8/18 11:03 [from run number 4624] switch LAN cable (KEK110RJ4 <-> KEK112RJ4) because no signal is seen with OnlineMonitor
-- Atlasj Silicon - 2016-08-18
8/18 10:20 for batch24(RJ4 run), moved the box 20mm "Up"
-- Atlasj Silicon - 2016-08-18
8/18 17:19 moved the box 22mm "DOWN" for RJ3 -> RJ2 (batch 22, geoid 106)
-- Atlasj Silicon - 2016-08-18
8/18 13:46 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (400,0,400,100,300) [V] I_leak start (83,0,94,0,0) [uA]
-- Atlasj Silicon - 2016-08-18
8/18 14:20 for batch21(RJ3 run), moved the box 21mm "Forword"
-- Atlasj Silicon - 2016-08-18
8/18 18:28 "No beam from Booster Expert is on his way 1 hour minimum" 一時間ほどビーム出ない模様…
-- Atlasj Silicon - 2016-08-18
8/18 22:39 beam back
-- Atlasj Silicon - 2016-08-18
8/19 1:00 for batch23(RJ1 run), moved the box 20mm "Back"
-- Junki Suzuki - 2016-08-18
8/19 4:54 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (600,0,600,100,300) [V] I_leak start (98,0,113,0,0) [uA]
-- Junki Suzuki - 2016-08-19
8/19 17:43 for RJ4 run, geoid112, moved the box 20mm "UP"
-- Atlasj Silicon - 2016-08-19
8/19 20:40 beam stop about 20 minutes
-- Atlasj Silicon - 2016-08-19
8/19 22:07 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (800,0,800,200,300) [V] I_leak start (76,0,81,0,0) [uA]
-- Atlasj Silicon - 2016-08-19
8/19 22:34 for batch21(RJ3 run), moved the box 23mm "FORWARD"
-- Atlasj Silicon - 2016-08-19
8/20 7:49 KEK109RJ2 cannot be configured, excluding KEK109RJ2.
-- Atlasj Silicon - 2016-08-20
8/20 7:53 for batch22(RJ2 run), moved the box 20mm "Down"
-- Atlasj Silicon - 2016-08-20
8/20 7:59 change batch 22 Run Control configuration : Inlink/outlink 2 (KEK109RJ2) -> Inlink/outlink 1 (KEK109RJ1)
-- Atlasj Silicon - 2016-08-20
8/20 9:10 Too many "Event not valid..." messages. Restarting rce & LV power cycle.
-- Atlasj Silicon - 2016-08-20
8/20 18:00 for batch23(RJ1 run, geoid115), moved the box 21mm "Backward"
-- Atlasj Silicon - 2016-08-20
8/21 4:05 for batch 24(RJ4 run, geoID116), moved the box 20mm "Up"
-- Atlasj Silicon - 2016-08-21
8/21 7:12 PS POPS down. Beam stop.
-- Atlasj Silicon - 2016-08-21
HV (800,0,800,200,300) [V] I_leak (73,0,156,0,0) [uA]
-- Junki Suzuki - 2016-08-21
8/21 20:58 Beam back
-- Atlasj Silicon - 2016-08-21
8/22 1:21 HV (1000,0,1000,200,300) [V] I_leak (114,0,158,0,0) [uA]
-- Atlasj Silicon - 2016-08-21
8/22 5:00 Meesage "Error section invalid: # # #" from run#4808 -> due to telescope LV current limit (problem with 4th layer of telescope) -> restarted telescope, problem solved
-- Atlasj Silicon - 2016-08-22
8/22 9:02 Still KEK109RJ2 cannot be configured