Difference: Aug2016CERNTBLog (1 vs. 33)

Revision 332016-08-23 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 220 to 220
 8/22 22:37 for batch 23(RJ1 run, geoID119), moved the box 22mm "Backward"

-- Atlasj Silicon - 2016-08-22

Added:
>
>

8/23 9:25 beam intensity ~ 50% -> beam collimator3 changes 10mm to 6mm, so event rate ~6600 per spill

-- Atlasj Silicon - 2016-08-23

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 322016-08-22 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 215 to 215
 8/22 18:21 beam intensity ~ 25% until tomorrow. -> beam collimator changes 6mm to 10mm, so event rate ~ 7600 per spill

-- Atlasj Silicon - 2016-08-22

Added:
>
>

8/22 22:37 for batch 23(RJ1 run, geoID119), moved the box 22mm "Backward"

-- Atlasj Silicon - 2016-08-22

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 312016-08-22 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 196 to 196
  -- Atlasj Silicon - 2016-08-22
Changed:
<
<
8/22 9:30 for batch 22(RJ2 run, geoID118), moved the box 20mm "Down"
>
>
8/22 9:30 for batch 22(RJ2 run, geoID118), moved the box 20mm "Down"
  -- Atlasj Silicon - 2016-08-22
Line: 217 to 212
  -- Atlasj Silicon - 2016-08-22
Changed:
<
<
8/22 18:21 beam intensity ~ 25% until tomorrow. -> beam collimator changes 6mm to 10mm, so event rate ~ 7600 per spil
>
>
8/22 18:21 beam intensity ~ 25% until tomorrow. -> beam collimator changes 6mm to 10mm, so event rate ~ 7600 per spill
  -- Atlasj Silicon - 2016-08-22
<--/commentPlugin-->

Revision 302016-08-22 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 216 to 216
 8/22 10:35 event building stopped eudaq restart

-- Atlasj Silicon - 2016-08-22

Added:
>
>

8/22 18:21 beam intensity ~ 25% until tomorrow. -> beam collimator changes 6mm to 10mm, so event rate ~ 7600 per spil

-- Atlasj Silicon - 2016-08-22

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

Revision 292016-08-22 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 191 to 191
  8/22 5:00 Meesage "Error section invalid: # # #" from run#4808
-> due to telescope LV current limit (problem with 4th layer of telescope)
-> restarted telescope, problem solved
Changed:
<
<
-- Atlasj Silicon - 2016-08-22

<--/commentPlugin-->
>
>
-- Atlasj Silicon - 2016-08-22

8/22 9:02 Still KEK109RJ2 cannot be configured

-- Atlasj Silicon - 2016-08-22

8/22 9:30 for batch 22(RJ2 run, geoID118), moved the box 20mm "Down"

-- Atlasj Silicon - 2016-08-22

8/22 9:32 Edit before_GeoID_th2400_7ToTTat10ke_th2400_7ToTat20ke_th3000_7ToTat10ke.pl (No need ToT_CALIB twice)

-- Atlasj Silicon - 2016-08-22

8/22 9:50 NI crate PC reboot since it works slowly.

-- Atlasj Silicon - 2016-08-22

8/22 10:35 event building stopped eudaq restart

-- Atlasj Silicon - 2016-08-22

<--/commentPlugin-->
  -- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 282016-08-22 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 189 to 189
  -- Atlasj Silicon - 2016-08-21
Changed:
<
<
8/22 5:00 Meesage "Error section invalid: # # #" from run#4808
-> due to telescope LV current limit
-> restarted telescope, problem solved
>
>
8/22 5:00 Meesage "Error section invalid: # # #" from run#4808
-> due to telescope LV current limit (problem with 4th layer of telescope)
-> restarted telescope, problem solved
  -- Atlasj Silicon - 2016-08-22

<--/commentPlugin-->

Revision 272016-08-22 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

back to Aug2016CERNTB

Add Log

Changed:
<
<
8/15 Tuning & noise scan for (irradiated sensor) KEK109~111, (non-irradiated sensor) KEK112, and (reference plane) KEK82,83,94 ...done.
>
>
8/15 Tuning & noise scan for (irradiated sensor) KEK109~111, (non-irradiated sensor) KEK112, and (reference plane) KEK82,83,94 ...done.
  -- Atlasj Silicon - 2016-08-16
Line: 22 to 21
  -- Junki Suzuki - 2016-08-17
Changed:
<
<
8/17 19:00 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (200,200,200,50,300) [V] I_leak start (194,202,276,0,0) [uA]
>
>
8/17 19:00 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (200,200,200,50,300) [V] I_leak start (194,202,276,0,0) [uA]
  -- Junki Suzuki - 2016-08-17
Line: 93 to 89
  -- Atlasj Silicon - 2016-08-18
Changed:
<
<
for batch23(RJ1 run), moved the box about 23mm "Backward" (Since there was a happening of moving the box too much Forward, the box stopped while moving. Don't know the exact position of box right now.)
>
>
for batch23(RJ1 run), moved the box about 23mm "Backward" (Since there was a happening of moving the box too much Forward, the box stopped while moving. Don't know the exact position of box right now.)
  -- Atlasj Silicon - 2016-08-18
Line: 152 to 145
  -- Atlasj Silicon - 2016-08-19
Changed:
<
<
8/19 22:34 for batch21(RJ3 run), moved the box 23mm "FORWARD"
>
>
8/19 22:34 for batch21(RJ3 run), moved the box 23mm "FORWARD"
  -- Atlasj Silicon - 2016-08-19
Line: 162 to 153
  -- Atlasj Silicon - 2016-08-20
Changed:
<
<
8/20 7:53 for batch22(RJ2 run), moved the box 20mm "Down"
>
>
8/20 7:53 for batch22(RJ2 run), moved the box 20mm "Down"
  -- Atlasj Silicon - 2016-08-20
Changed:
<
<
8/20 7:59 change batch 22 Run Control configuration : Inlink/outlink 2 (KEK109RJ2) -> Inlink/outlink 1 (KEK109RJ1)
>
>
8/20 7:59 change batch 22 Run Control configuration : Inlink/outlink 2 (KEK109RJ2) -> Inlink/outlink 1 (KEK109RJ1)
  -- Atlasj Silicon - 2016-08-20
Changed:
<
<
8/20 9:10 Too many "Event not valid..." messages. Restarting rce & LV power cycle.
>
>
8/20 9:10 Too many "Event not valid..." messages. Restarting rce & LV power cycle.
  -- Atlasj Silicon - 2016-08-20
Changed:
<
<
8/20 18:00 for batch23(RJ1 run, geoid115), moved the box 21mm "Backward"
>
>
8/20 18:00 for batch23(RJ1 run, geoid115), moved the box 21mm "Backward"
  -- Atlasj Silicon - 2016-08-20
Changed:
<
<
8/21 4:05 for batch 24(RJ4 run, geoID116), moved the box 20mm "Up"
>
>
8/21 4:05 for batch 24(RJ4 run, geoID116), moved the box 20mm "Up"
  -- Atlasj Silicon - 2016-08-21
Line: 207 to 188
 8/22 1:21 HV (1000,0,1000,200,300) [V] I_leak (114,0,158,0,0) [uA]

-- Atlasj Silicon - 2016-08-21

Changed:
<
<
<--/commentPlugin-->
>
>
8/22 5:00 Meesage "Error section invalid: # # #" from run#4808
-> due to telescope LV current limit
-> restarted telescope, problem solved

-- Atlasj Silicon - 2016-08-22


<--/commentPlugin-->
  -- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 262016-08-21 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 202 to 202
 8/21 20:58 Beam back

-- Atlasj Silicon - 2016-08-21

Added:
>
>

8/22 1:21 HV (1000,0,1000,200,300) [V] I_leak (114,0,158,0,0) [uA]

-- Atlasj Silicon - 2016-08-21

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 252016-08-21 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 197 to 197
 HV (800,0,800,200,300) [V] I_leak (73,0,156,0,0) [uA]

-- Junki Suzuki - 2016-08-21

Added:
>
>

8/21 20:58 Beam back

-- Atlasj Silicon - 2016-08-21

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 242016-08-21 - JunkiSuzuki

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 192 to 192
 

-- Atlasj Silicon - 2016-08-21

Added:
>
>

HV (800,0,800,200,300) [V] I_leak (73,0,156,0,0) [uA]

-- Junki Suzuki - 2016-08-21

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 232016-08-21 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 186 to 186
 8/21 4:05 for batch 24(RJ4 run, geoID116), moved the box 20mm "Up"

-- Atlasj Silicon - 2016-08-21

Added:
>
>

8/21 7:12 PS POPS down. Beam stop.

-- Atlasj Silicon - 2016-08-21

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 222016-08-21 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 181 to 181
 8/20 18:00 for batch23(RJ1 run, geoid115), moved the box 21mm "Backward"

-- Atlasj Silicon - 2016-08-20

Added:
>
>

8/21 4:05 for batch 24(RJ4 run, geoID116), moved the box 20mm "Up"

-- Atlasj Silicon - 2016-08-21

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 212016-08-20 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 176 to 176
 8/20 9:10 Too many "Event not valid..." messages. Restarting rce & LV power cycle.

-- Atlasj Silicon - 2016-08-20

Added:
>
>

8/20 18:00 for batch23(RJ1 run, geoid115), moved the box 21mm "Backward"

-- Atlasj Silicon - 2016-08-20

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 202016-08-20 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 171 to 171
 8/20 7:59 change batch 22 Run Control configuration : Inlink/outlink 2 (KEK109RJ2) -> Inlink/outlink 1 (KEK109RJ1)

-- Atlasj Silicon - 2016-08-20

Added:
>
>

8/20 9:10 Too many "Event not valid..." messages. Restarting rce & LV power cycle.

-- Atlasj Silicon - 2016-08-20

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

Revision 192016-08-20 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 156 to 156
 8/19 22:34 for batch21(RJ3 run), moved the box 23mm "FORWARD"

-- Atlasj Silicon - 2016-08-19

Added:
>
>

8/20 7:49 KEK109RJ2 cannot be configured, excluding KEK109RJ2.

-- Atlasj Silicon - 2016-08-20

8/20 7:53 for batch22(RJ2 run), moved the box 20mm "Down"

-- Atlasj Silicon - 2016-08-20

8/20 7:59 change batch 22 Run Control configuration : Inlink/outlink 2 (KEK109RJ2) -> Inlink/outlink 1 (KEK109RJ1)

-- Atlasj Silicon - 2016-08-20

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

Revision 182016-08-19 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 146 to 146
 8/19 20:40 beam stop about 20 minutes

-- Atlasj Silicon - 2016-08-19

Added:
>
>

8/19 22:07 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (800,0,800,200,300) [V] I_leak start (76,0,81,0,0) [uA]

-- Atlasj Silicon - 2016-08-19

8/19 22:34 for batch21(RJ3 run), moved the box 23mm "FORWARD"

-- Atlasj Silicon - 2016-08-19

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 172016-08-19 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 141 to 141
 8/19 17:43 for RJ4 run, geoid112, moved the box 20mm "UP"

-- Atlasj Silicon - 2016-08-19

Added:
>
>

8/19 20:40 beam stop about 20 minutes

-- Atlasj Silicon - 2016-08-19

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

Revision 162016-08-19 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 138 to 137
 8/19 4:54 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (600,0,600,100,300) [V] I_leak start (98,0,113,0,0) [uA]

-- Junki Suzuki - 2016-08-19

Added:
>
>
8/19 17:43 for RJ4 run, geoid112, moved the box 20mm "UP"

-- Atlasj Silicon - 2016-08-19

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 152016-08-19 - JunkiSuzuki

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 133 to 133
 8/19 1:00 for batch23(RJ1 run), moved the box 20mm "Back"

-- Junki Suzuki - 2016-08-18

Added:
>
>

8/19 4:54 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (600,0,600,100,300) [V] I_leak start (98,0,113,0,0) [uA]

-- Junki Suzuki - 2016-08-19

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

Revision 142016-08-18 - JunkiSuzuki

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 110 to 110
  -- Atlasj Silicon - 2016-08-18
Changed:
<
<
8/18 17:19 moved the box 22mm "DOWN" for RJ3 -> RJ2 (batch 22, geoid 106)
>
>
8/18 17:19 moved the box 22mm "DOWN" for RJ3 -> RJ2 (batch 22, geoid 106)
  -- Atlasj Silicon - 2016-08-18
Line: 120 to 118
  -- Atlasj Silicon - 2016-08-18
Changed:
<
<
8/18 14:20 for batch21(RJ3 run), moved the box 21mm "Forword"
>
>
8/18 14:20 for batch21(RJ3 run), moved the box 21mm "Forword"
  -- Atlasj Silicon - 2016-08-18
Changed:
<
<
8/18 18:28 "No beam from Booster Expert is on his way 1 hour minimum" 一時間ほどビーム出ない模様…
>
>
8/18 18:28 "No beam from Booster Expert is on his way 1 hour minimum" 一時間ほどビーム出ない模様…
  -- Atlasj Silicon - 2016-08-18
Line: 134 to 129
 8/18 22:39 beam back

-- Atlasj Silicon - 2016-08-18

Added:
>
>
8/19 1:00 for batch23(RJ1 run), moved the box 20mm "Back"

-- Junki Suzuki - 2016-08-18

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 132016-08-18 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 129 to 129
 8/18 18:28 "No beam from Booster Expert is on his way 1 hour minimum" 一時間ほどビーム出ない模様…

-- Atlasj Silicon - 2016-08-18

Added:
>
>

8/18 22:39 beam back

-- Atlasj Silicon - 2016-08-18

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

Revision 122016-08-18 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 109 to 109
 8/18 10:20 for batch24(RJ4 run), moved the box 20mm "Up"

-- Atlasj Silicon - 2016-08-18

Added:
>
>

8/18 17:19 moved the box 22mm "DOWN" for RJ3 -> RJ2 (batch 22, geoid 106)

-- Atlasj Silicon - 2016-08-18

8/18 13:46 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (400,0,400,100,300) [V] I_leak start (83,0,94,0,0) [uA]

-- Atlasj Silicon - 2016-08-18

8/18 14:20 for batch21(RJ3 run), moved the box 21mm "Forword"

-- Atlasj Silicon - 2016-08-18

8/18 18:28 "No beam from Booster Expert is on his way 1 hour minimum" 一時間ほどビーム出ない模様…

-- Atlasj Silicon - 2016-08-18

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

Revision 112016-08-18 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 102 to 101
 No beam from around 7:20.

-- Atlasj Silicon - 2016-08-18

Added:
>
>
8/18 11:03 [from run number 4624] switch LAN cable (KEK110RJ4 <-> KEK112RJ4) because no signal is seen with OnlineMonitor

-- Atlasj Silicon - 2016-08-18

8/18 10:20 for batch24(RJ4 run), moved the box 20mm "Up"

-- Atlasj Silicon - 2016-08-18

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

Revision 102016-08-18 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 89 to 88
 8/18 4:30 HV of KEK110 can only be increased up to about 30V. Started run with 0V.

-- Atlasj Silicon - 2016-08-18

Added:
>
>
for batch22(RJ2 run), moved the box 17mm "Down"

-- Atlasj Silicon - 2016-08-18

for batch23(RJ1 run), moved the box about 23mm "Backward" (Since there was a happening of moving the box too much Forward, the box stopped while moving. Don't know the exact position of box right now.)

-- Atlasj Silicon - 2016-08-18

No beam from around 7:20.

-- Atlasj Silicon - 2016-08-18

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 92016-08-18 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 84 to 84
 8/18 0:30 increased temperature setpoint to 10 degrees

-- Atlasj Silicon - 2016-08-17

Added:
>
>

8/18 4:30 HV of KEK110 can only be increased up to about 30V. Started run with 0V.

-- Atlasj Silicon - 2016-08-18

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

Revision 82016-08-17 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 77 to 77
  -- Atlasj Silicon - 2016-08-17
Changed:
<
<
8/17 21:12 Alignment stage down -> 40mm forward -> 40mm up -> 40mm forward -> 10mm back -> 20mm back -> 10mm forward -> 5mm
>
>
8/17 21:12 Alignment stage down -> 40mm forward -> 40mm up -> 40mm forward -> 10mm back -> 20mm back -> 10mm forward -> 5mm
  -- Junki Suzuki - 2016-08-17
Added:
>
>
8/18 0:30 increased temperature setpoint to 10 degrees

-- Atlasj Silicon - 2016-08-17

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 72016-08-17 - JunkiSuzuki

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 76 to 76
 8/17 20:56 HV OFF (KEK109,110,111)

-- Atlasj Silicon - 2016-08-17

Added:
>
>

8/17 21:12 Alignment stage down -> 40mm forward -> 40mm up -> 40mm forward -> 10mm back -> 20mm back -> 10mm forward -> 5mm

-- Junki Suzuki - 2016-08-17

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

Revision 62016-08-17 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 45 to 45
  -- Junki Suzuki - 2016-08-17
Added:
>
>
8/17 19:33 Alignment start stage forward -> 10mm
 
Changed:
<
<
8/17 19:33 Alignment start stage forward -> 10mm
>
>
-- Junki Suzuki - 2016-08-17

8/17 19:38 Alignment start stage forward -> 20mm

  -- Junki Suzuki - 2016-08-17
Added:
>
>
8/17 20:00 Alignment start stage up -> 10mm
 
Changed:
<
<
8/17 19:38 Alignment start stage forward -> 20mm
>
>
-- Atlasj Silicon - 2016-08-17
 
Changed:
<
<
-- Junki Suzuki - 2016-08-17
>
>
8/17 20:07 I_leak (43,35,45,0,0) [uA] @-58degC

-- Atlasj Silicon - 2016-08-17

8/17 20:19 Alignment start stage forward -> 40mm

-- Atlasj Silicon - 2016-08-17

8/17 20:27 Alignment start stage back -> 80mm

-- Atlasj Silicon - 2016-08-17

8/17 20:31 Alignment start stage down -> 30mm

-- Atlasj Silicon - 2016-08-17

8/17 20:56 HV OFF (KEK109,110,111)

-- Atlasj Silicon - 2016-08-17

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

Revision 52016-08-17 - JunkiSuzuki

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 17 to 14
  -- Atlasj Silicon - 2016-08-16
Added:
>
>
8/17 16:00 threshold has changed. (by temperature ?) -> re-tune

-- Junki Suzuki - 2016-08-17

8/17 18:49 too many leakage current ~-200uA@-200V (KEK109,110,111) and current limit(HV line) does not work.

-- Junki Suzuki - 2016-08-17

8/17 19:00 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (200,200,200,50,300) [V] I_leak start (194,202,276,0,0) [uA]

-- Junki Suzuki - 2016-08-17

8/17 19:17 and_mask=7 ~4600 events/spill

-- Junki Suzuki - 2016-08-17

8/17 19:17 and_mask=3 ~7500 events/spill

-- Junki Suzuki - 2016-08-17

8/17 19:17 and_mask=12 ~2300 events/spill

-- Junki Suzuki - 2016-08-17

8/17 19:17 set "and_mask -> 3", run start

-- Junki Suzuki - 2016-08-17

8/17 19:33 Alignment start stage forward -> 10mm

-- Junki Suzuki - 2016-08-17

 
Changed:
<
<
8/17 16:00 threshold has changed. (by temperature ?) -> re-tune
>
>
8/17 19:38 Alignment start stage forward -> 20mm
  -- Junki Suzuki - 2016-08-17
<--/commentPlugin-->

Revision 42016-08-17 - JunkiSuzuki

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 16 to 16
 8/16 22:00~ Angle run alignment & daq start at H6B

-- Atlasj Silicon - 2016-08-16

Added:
>
>

8/17 16:00 threshold has changed. (by temperature ?) -> re-tune

-- Junki Suzuki - 2016-08-17

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 32016-08-16 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

Line: 11 to 11
 Tuning & noise scan for (irradiated sensor) KEK109~111, (non-irradiated sensor) KEK112, and (reference plane) KEK82,83,94 ...done.

-- Atlasj Silicon - 2016-08-16

Added:
>
>

8/16 22:00~ Angle run alignment & daq start at H6B

-- Atlasj Silicon - 2016-08-16

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 22016-08-16 - AtlasjSilicon

Line: 1 to 1
 
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

back to Aug2016CERNTB

Add Log

Added:
>
>

8/15 Tuning & noise scan for (irradiated sensor) KEK109~111, (non-irradiated sensor) KEK112, and (reference plane) KEK82,83,94 ...done.

-- Atlasj Silicon - 2016-08-16

 
<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11 \ No newline at end of file

Revision 12016-08-11 - KojiNakamura

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="Aug2016CERNTB"

Aug 2016 CERN TB Log page

back to Aug2016CERNTB

Add Log

<--/commentPlugin-->

-- Koji Nakamura - 2016-08-11

 