Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 220 to 220 | ||||||||
8/22 22:37 for batch 23(RJ1 run, geoID119), moved the box 22mm "Backward" -- Atlasj Silicon - 2016-08-22 | ||||||||
Added: | ||||||||
> > | 8/23 9:25 beam intensity ~ 50% -> beam collimator3 changes 10mm to 6mm, so event rate ~6600 per spill -- Atlasj Silicon - 2016-08-23 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 215 to 215 | ||||||||
8/22 18:21 beam intensity ~ 25% until tomorrow. -> beam collimator changes 6mm to 10mm, so event rate ~ 7600 per spill -- Atlasj Silicon - 2016-08-22 | ||||||||
Added: | ||||||||
> > | 8/22 22:37 for batch 23(RJ1 run, geoID119), moved the box 22mm "Backward" -- Atlasj Silicon - 2016-08-22 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 196 to 196 | ||||||||
-- Atlasj Silicon - 2016-08-22 | ||||||||
Changed: | ||||||||
< < | 8/22 9:30 for batch 22(RJ2 run, geoID118), moved the box 20mm "Down" | |||||||
> > | 8/22 9:30 for batch 22(RJ2 run, geoID118), moved the box 20mm "Down" | |||||||
-- Atlasj Silicon - 2016-08-22 | ||||||||
Line: 217 to 212 | ||||||||
-- Atlasj Silicon - 2016-08-22 | ||||||||
Changed: | ||||||||
< < | 8/22 18:21 beam intensity ~ 25% until tomorrow. -> beam collimator changes 6mm to 10mm, so event rate ~ 7600 per spil | |||||||
> > | 8/22 18:21 beam intensity ~ 25% until tomorrow. -> beam collimator changes 6mm to 10mm, so event rate ~ 7600 per spill | |||||||
-- Atlasj Silicon - 2016-08-22 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 216 to 216 | ||||||||
8/22 10:35 event building stopped eudaq restart -- Atlasj Silicon - 2016-08-22 | ||||||||
Added: | ||||||||
> > | 8/22 18:21 beam intensity ~ 25% until tomorrow. -> beam collimator changes 6mm to 10mm, so event rate ~ 7600 per spil -- Atlasj Silicon - 2016-08-22 | |||||||
-- Koji Nakamura - 2016-08-11 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 191 to 191 | ||||||||
8/22 5:00 Meesage "Error section invalid: # # #" from run#4808 -> due to telescope LV current limit (problem with 4th layer of telescope) -> restarted telescope, problem solved | ||||||||
Changed: | ||||||||
< < | -- Atlasj Silicon - 2016-08-22 | |||||||
> > | -- Atlasj Silicon - 2016-08-22 8/22 9:02 Still KEK109RJ2 cannot be configured -- Atlasj Silicon - 2016-08-22 8/22 9:30 for batch 22(RJ2 run, geoID118), moved the box 20mm "Down" -- Atlasj Silicon - 2016-08-22 8/22 9:32 Edit before_GeoID_th2400_7ToTTat10ke_th2400_7ToTat20ke_th3000_7ToTat10ke.pl (No need ToT_CALIB twice) -- Atlasj Silicon - 2016-08-22 8/22 9:50 NI crate PC reboot since it works slowly. -- Atlasj Silicon - 2016-08-22 8/22 10:35 event building stopped eudaq restart -- Atlasj Silicon - 2016-08-22 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 189 to 189 | ||||||||
-- Atlasj Silicon - 2016-08-21 | ||||||||
Changed: | ||||||||
< < | 8/22 5:00 Meesage "Error section invalid: # # #" from run#4808 -> due to telescope LV current limit -> restarted telescope, problem solved | |||||||
> > | 8/22 5:00 Meesage "Error section invalid: # # #" from run#4808 -> due to telescope LV current limit (problem with 4th layer of telescope) -> restarted telescope, problem solved | |||||||
-- Atlasj Silicon - 2016-08-22 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log pageback to Aug2016CERNTBAdd Log | ||||||||
Changed: | ||||||||
< < | 8/15 Tuning & noise scan for (irradiated sensor) KEK109~111, (non-irradiated sensor) KEK112, and (reference plane) KEK82,83,94 ...done. | |||||||
> > | 8/15 Tuning & noise scan for (irradiated sensor) KEK109~111, (non-irradiated sensor) KEK112, and (reference plane) KEK82,83,94 ...done. | |||||||
-- Atlasj Silicon - 2016-08-16 | ||||||||
Line: 22 to 21 | ||||||||
-- Junki Suzuki - 2016-08-17 | ||||||||
Changed: | ||||||||
< < | 8/17 19:00 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (200,200,200,50,300) [V] I_leak start (194,202,276,0,0) [uA] | |||||||
> > | 8/17 19:00 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (200,200,200,50,300) [V] I_leak start (194,202,276,0,0) [uA] | |||||||
-- Junki Suzuki - 2016-08-17 | ||||||||
Line: 93 to 89 | ||||||||
-- Atlasj Silicon - 2016-08-18 | ||||||||
Changed: | ||||||||
< < | for batch23(RJ1 run), moved the box about 23mm "Backward" (Since there was a happening of moving the box too much Forward, the box stopped while moving. Don't know the exact position of box right now.) | |||||||
> > | for batch23(RJ1 run), moved the box about 23mm "Backward" (Since there was a happening of moving the box too much Forward, the box stopped while moving. Don't know the exact position of box right now.) | |||||||
-- Atlasj Silicon - 2016-08-18 | ||||||||
Line: 152 to 145 | ||||||||
-- Atlasj Silicon - 2016-08-19 | ||||||||
Changed: | ||||||||
< < | 8/19 22:34 for batch21(RJ3 run), moved the box 23mm "FORWARD" | |||||||
> > | 8/19 22:34 for batch21(RJ3 run), moved the box 23mm "FORWARD" | |||||||
-- Atlasj Silicon - 2016-08-19 | ||||||||
Line: 162 to 153 | ||||||||
-- Atlasj Silicon - 2016-08-20 | ||||||||
Changed: | ||||||||
< < | 8/20 7:53 for batch22(RJ2 run), moved the box 20mm "Down" | |||||||
> > | 8/20 7:53 for batch22(RJ2 run), moved the box 20mm "Down" | |||||||
-- Atlasj Silicon - 2016-08-20 | ||||||||
Changed: | ||||||||
< < | 8/20 7:59 change batch 22 Run Control configuration : Inlink/outlink 2 (KEK109RJ2) -> Inlink/outlink 1 (KEK109RJ1) | |||||||
> > | 8/20 7:59 change batch 22 Run Control configuration : Inlink/outlink 2 (KEK109RJ2) -> Inlink/outlink 1 (KEK109RJ1) | |||||||
-- Atlasj Silicon - 2016-08-20 | ||||||||
Changed: | ||||||||
< < | 8/20 9:10 Too many "Event not valid..." messages. Restarting rce & LV power cycle. | |||||||
> > | 8/20 9:10 Too many "Event not valid..." messages. Restarting rce & LV power cycle. | |||||||
-- Atlasj Silicon - 2016-08-20 | ||||||||
Changed: | ||||||||
< < | 8/20 18:00 for batch23(RJ1 run, geoid115), moved the box 21mm "Backward" | |||||||
> > | 8/20 18:00 for batch23(RJ1 run, geoid115), moved the box 21mm "Backward" | |||||||
-- Atlasj Silicon - 2016-08-20 | ||||||||
Changed: | ||||||||
< < | 8/21 4:05 for batch 24(RJ4 run, geoID116), moved the box 20mm "Up" | |||||||
> > | 8/21 4:05 for batch 24(RJ4 run, geoID116), moved the box 20mm "Up" | |||||||
-- Atlasj Silicon - 2016-08-21 | ||||||||
Line: 207 to 188 | ||||||||
8/22 1:21 HV (1000,0,1000,200,300) [V] I_leak (114,0,158,0,0) [uA] -- Atlasj Silicon - 2016-08-21 | ||||||||
Changed: | ||||||||
< < | ||||||||
> > |
8/22 5:00 Meesage "Error section invalid: # # #" from run#4808 -> due to telescope LV current limit -> restarted telescope, problem solved -- Atlasj Silicon - 2016-08-22 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 202 to 202 | ||||||||
8/21 20:58 Beam back -- Atlasj Silicon - 2016-08-21 | ||||||||
Added: | ||||||||
> > | 8/22 1:21 HV (1000,0,1000,200,300) [V] I_leak (114,0,158,0,0) [uA] -- Atlasj Silicon - 2016-08-21 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 197 to 197 | ||||||||
HV (800,0,800,200,300) [V] I_leak (73,0,156,0,0) [uA] -- Junki Suzuki - 2016-08-21 | ||||||||
Added: | ||||||||
> > | 8/21 20:58 Beam back -- Atlasj Silicon - 2016-08-21 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 192 to 192 | ||||||||
-- Atlasj Silicon - 2016-08-21 | ||||||||
Added: | ||||||||
> > | HV (800,0,800,200,300) [V] I_leak (73,0,156,0,0) [uA] -- Junki Suzuki - 2016-08-21 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 186 to 186 | ||||||||
8/21 4:05 for batch 24(RJ4 run, geoID116), moved the box 20mm "Up" -- Atlasj Silicon - 2016-08-21 | ||||||||
Added: | ||||||||
> > | 8/21 7:12 PS POPS down. Beam stop. -- Atlasj Silicon - 2016-08-21 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 181 to 181 | ||||||||
8/20 18:00 for batch23(RJ1 run, geoid115), moved the box 21mm "Backward" -- Atlasj Silicon - 2016-08-20 | ||||||||
Added: | ||||||||
> > | 8/21 4:05 for batch 24(RJ4 run, geoID116), moved the box 20mm "Up" -- Atlasj Silicon - 2016-08-21 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 176 to 176 | ||||||||
8/20 9:10 Too many "Event not valid..." messages. Restarting rce & LV power cycle. -- Atlasj Silicon - 2016-08-20 | ||||||||
Added: | ||||||||
> > | 8/20 18:00 for batch23(RJ1 run, geoid115), moved the box 21mm "Backward" -- Atlasj Silicon - 2016-08-20 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 171 to 171 | ||||||||
8/20 7:59 change batch 22 Run Control configuration : Inlink/outlink 2 (KEK109RJ2) -> Inlink/outlink 1 (KEK109RJ1) -- Atlasj Silicon - 2016-08-20 | ||||||||
Added: | ||||||||
> > | 8/20 9:10 Too many "Event not valid..." messages. Restarting rce & LV power cycle. -- Atlasj Silicon - 2016-08-20 | |||||||
-- Koji Nakamura - 2016-08-11 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 156 to 156 | ||||||||
8/19 22:34 for batch21(RJ3 run), moved the box 23mm "FORWARD" -- Atlasj Silicon - 2016-08-19 | ||||||||
Added: | ||||||||
> > | 8/20 7:49 KEK109RJ2 cannot be configured, excluding KEK109RJ2. -- Atlasj Silicon - 2016-08-20 8/20 7:53 for batch22(RJ2 run), moved the box 20mm "Down" -- Atlasj Silicon - 2016-08-20 8/20 7:59 change batch 22 Run Control configuration : Inlink/outlink 2 (KEK109RJ2) -> Inlink/outlink 1 (KEK109RJ1) -- Atlasj Silicon - 2016-08-20 | |||||||
-- Koji Nakamura - 2016-08-11 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 146 to 146 | ||||||||
8/19 20:40 beam stop about 20 minutes -- Atlasj Silicon - 2016-08-19 | ||||||||
Added: | ||||||||
> > | 8/19 22:07 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (800,0,800,200,300) [V] I_leak start (76,0,81,0,0) [uA] -- Atlasj Silicon - 2016-08-19 8/19 22:34 for batch21(RJ3 run), moved the box 23mm "FORWARD" -- Atlasj Silicon - 2016-08-19 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 141 to 141 | ||||||||
8/19 17:43 for RJ4 run, geoid112, moved the box 20mm "UP" -- Atlasj Silicon - 2016-08-19 | ||||||||
Added: | ||||||||
> > | 8/19 20:40 beam stop about 20 minutes -- Atlasj Silicon - 2016-08-19 | |||||||
-- Koji Nakamura - 2016-08-11 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 138 to 137 | ||||||||
8/19 4:54 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (600,0,600,100,300) [V] I_leak start (98,0,113,0,0) [uA] -- Junki Suzuki - 2016-08-19 | ||||||||
Added: | ||||||||
> > | 8/19 17:43 for RJ4 run, geoid112, moved the box 20mm "UP" -- Atlasj Silicon - 2016-08-19 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 133 to 133 | ||||||||
8/19 1:00 for batch23(RJ1 run), moved the box 20mm "Back" -- Junki Suzuki - 2016-08-18 | ||||||||
Added: | ||||||||
> > | 8/19 4:54 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (600,0,600,100,300) [V] I_leak start (98,0,113,0,0) [uA] -- Junki Suzuki - 2016-08-19 | |||||||
-- Koji Nakamura - 2016-08-11 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 110 to 110 | ||||||||
-- Atlasj Silicon - 2016-08-18 | ||||||||
Changed: | ||||||||
< < | 8/18 17:19 moved the box 22mm "DOWN" for RJ3 -> RJ2 (batch 22, geoid 106) | |||||||
> > | 8/18 17:19 moved the box 22mm "DOWN" for RJ3 -> RJ2 (batch 22, geoid 106) | |||||||
-- Atlasj Silicon - 2016-08-18 | ||||||||
Line: 120 to 118 | ||||||||
-- Atlasj Silicon - 2016-08-18 | ||||||||
Changed: | ||||||||
< < | 8/18 14:20 for batch21(RJ3 run), moved the box 21mm "Forword" | |||||||
> > | 8/18 14:20 for batch21(RJ3 run), moved the box 21mm "Forword" | |||||||
-- Atlasj Silicon - 2016-08-18 | ||||||||
Changed: | ||||||||
< < | 8/18 18:28 "No beam from Booster Expert is on his way 1 hour minimum" 一時間ほどビーム出ない模様… | |||||||
> > | 8/18 18:28 "No beam from Booster Expert is on his way 1 hour minimum" 一時間ほどビーム出ない模様… | |||||||
-- Atlasj Silicon - 2016-08-18 | ||||||||
Line: 134 to 129 | ||||||||
8/18 22:39 beam back -- Atlasj Silicon - 2016-08-18 | ||||||||
Added: | ||||||||
> > | 8/19 1:00 for batch23(RJ1 run), moved the box 20mm "Back" -- Junki Suzuki - 2016-08-18 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 129 to 129 | ||||||||
8/18 18:28 "No beam from Booster Expert is on his way 1 hour minimum" 一時間ほどビーム出ない模様… -- Atlasj Silicon - 2016-08-18 | ||||||||
Added: | ||||||||
> > | 8/18 22:39 beam back -- Atlasj Silicon - 2016-08-18 | |||||||
-- Koji Nakamura - 2016-08-11 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 109 to 109 | ||||||||
8/18 10:20 for batch24(RJ4 run), moved the box 20mm "Up" -- Atlasj Silicon - 2016-08-18 | ||||||||
Added: | ||||||||
> > | 8/18 17:19 moved the box 22mm "DOWN" for RJ3 -> RJ2 (batch 22, geoid 106) -- Atlasj Silicon - 2016-08-18 8/18 13:46 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (400,0,400,100,300) [V] I_leak start (83,0,94,0,0) [uA] -- Atlasj Silicon - 2016-08-18 8/18 14:20 for batch21(RJ3 run), moved the box 21mm "Forword" -- Atlasj Silicon - 2016-08-18 8/18 18:28 "No beam from Booster Expert is on his way 1 hour minimum" 一時間ほどビーム出ない模様… -- Atlasj Silicon - 2016-08-18 | |||||||
-- Koji Nakamura - 2016-08-11 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 102 to 101 | ||||||||
No beam from around 7:20. -- Atlasj Silicon - 2016-08-18 | ||||||||
Added: | ||||||||
> > | 8/18 11:03 [from run number 4624] switch LAN cable (KEK110RJ4 <-> KEK112RJ4) because no signal is seen with OnlineMonitor -- Atlasj Silicon - 2016-08-18 8/18 10:20 for batch24(RJ4 run), moved the box 20mm "Up" -- Atlasj Silicon - 2016-08-18 | |||||||
-- Koji Nakamura - 2016-08-11 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 89 to 88 | ||||||||
8/18 4:30 HV of KEK110 can only be increased up to about 30V. Started run with 0V. -- Atlasj Silicon - 2016-08-18 | ||||||||
Added: | ||||||||
> > | for batch22(RJ2 run), moved the box 17mm "Down" -- Atlasj Silicon - 2016-08-18 for batch23(RJ1 run), moved the box about 23mm "Backward" (Since there was a happening of moving the box too much Forward, the box stopped while moving. Don't know the exact position of box right now.) -- Atlasj Silicon - 2016-08-18 No beam from around 7:20. -- Atlasj Silicon - 2016-08-18 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 84 to 84 | ||||||||
8/18 0:30 increased temperature setpoint to 10 degrees -- Atlasj Silicon - 2016-08-17 | ||||||||
Added: | ||||||||
> > | 8/18 4:30 HV of KEK110 can only be increased up to about 30V. Started run with 0V. -- Atlasj Silicon - 2016-08-18 | |||||||
-- Koji Nakamura - 2016-08-11 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 77 to 77 | ||||||||
-- Atlasj Silicon - 2016-08-17 | ||||||||
Changed: | ||||||||
< < | 8/17 21:12 Alignment stage down -> 40mm forward -> 40mm up -> 40mm forward -> 10mm back -> 20mm back -> 10mm forward -> 5mm | |||||||
> > | 8/17 21:12 Alignment stage down -> 40mm forward -> 40mm up -> 40mm forward -> 10mm back -> 20mm back -> 10mm forward -> 5mm | |||||||
-- Junki Suzuki - 2016-08-17 | ||||||||
Added: | ||||||||
> > | 8/18 0:30 increased temperature setpoint to 10 degrees -- Atlasj Silicon - 2016-08-17 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 76 to 76 | ||||||||
8/17 20:56 HV OFF (KEK109,110,111) -- Atlasj Silicon - 2016-08-17 | ||||||||
Added: | ||||||||
> > | 8/17 21:12 Alignment stage down -> 40mm forward -> 40mm up -> 40mm forward -> 10mm back -> 20mm back -> 10mm forward -> 5mm -- Junki Suzuki - 2016-08-17 | |||||||
-- Koji Nakamura - 2016-08-11 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 45 to 45 | ||||||||
-- Junki Suzuki - 2016-08-17 | ||||||||
Added: | ||||||||
> > | 8/17 19:33 Alignment start stage forward -> 10mm | |||||||
Changed: | ||||||||
< < | 8/17 19:33 Alignment start stage forward -> 10mm | |||||||
> > | -- Junki Suzuki - 2016-08-17 8/17 19:38 Alignment start stage forward -> 20mm | |||||||
-- Junki Suzuki - 2016-08-17 | ||||||||
Added: | ||||||||
> > | 8/17 20:00 Alignment start stage up -> 10mm | |||||||
Changed: | ||||||||
< < | 8/17 19:38 Alignment start stage forward -> 20mm | |||||||
> > | -- Atlasj Silicon - 2016-08-17 | |||||||
Changed: | ||||||||
< < | -- Junki Suzuki - 2016-08-17 | |||||||
> > | 8/17 20:07 I_leak (43,35,45,0,0) [uA] @-58degC -- Atlasj Silicon - 2016-08-17 8/17 20:19 Alignment start stage forward -> 40mm -- Atlasj Silicon - 2016-08-17 8/17 20:27 Alignment start stage back -> 80mm -- Atlasj Silicon - 2016-08-17 8/17 20:31 Alignment start stage down -> 30mm -- Atlasj Silicon - 2016-08-17 8/17 20:56 HV OFF (KEK109,110,111) -- Atlasj Silicon - 2016-08-17 | |||||||
-- Koji Nakamura - 2016-08-11 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 17 to 14 | ||||||||
-- Atlasj Silicon - 2016-08-16 | ||||||||
Added: | ||||||||
> > | 8/17 16:00 threshold has changed. (by temperature ?) -> re-tune -- Junki Suzuki - 2016-08-17 8/17 18:49 too many leakage current ~-200uA@-200V (KEK109,110,111) and current limit(HV line) does not work. -- Junki Suzuki - 2016-08-17 8/17 19:00 module(KEK109,KEK110,KEK111,KEK112,KEK82) HV (200,200,200,50,300) [V] I_leak start (194,202,276,0,0) [uA] -- Junki Suzuki - 2016-08-17 8/17 19:17 and_mask=7 ~4600 events/spill -- Junki Suzuki - 2016-08-17 8/17 19:17 and_mask=3 ~7500 events/spill -- Junki Suzuki - 2016-08-17 8/17 19:17 and_mask=12 ~2300 events/spill -- Junki Suzuki - 2016-08-17 8/17 19:17 set "and_mask -> 3", run start -- Junki Suzuki - 2016-08-17 8/17 19:33 Alignment start stage forward -> 10mm -- Junki Suzuki - 2016-08-17 | |||||||
Changed: | ||||||||
< < | 8/17 16:00 threshold has changed. (by temperature ?) -> re-tune | |||||||
> > | 8/17 19:38 Alignment start stage forward -> 20mm | |||||||
-- Junki Suzuki - 2016-08-17 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 16 to 16 | ||||||||
8/16 22:00~ Angle run alignment & daq start at H6B -- Atlasj Silicon - 2016-08-16 | ||||||||
Added: | ||||||||
> > | 8/17 16:00 threshold has changed. (by temperature ?) -> re-tune -- Junki Suzuki - 2016-08-17 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log page | ||||||||
Line: 11 to 11 | ||||||||
Tuning & noise scan for (irradiated sensor) KEK109~111, (non-irradiated sensor) KEK112, and (reference plane) KEK82,83,94 ...done. -- Atlasj Silicon - 2016-08-16 | ||||||||
Added: | ||||||||
> > | 8/16 22:00~ Angle run alignment & daq start at H6B -- Atlasj Silicon - 2016-08-16 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Aug 2016 CERN TB Log pageback to Aug2016CERNTBAdd Log | ||||||||
Added: | ||||||||
> > | 8/15 Tuning & noise scan for (irradiated sensor) KEK109~111, (non-irradiated sensor) KEK112, and (reference plane) KEK82,83,94 ...done. -- Atlasj Silicon - 2016-08-16 | |||||||
-- Koji Nakamura - 2016-08-11 \ No newline at end of file |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Added: | ||||||||
> > |
Aug 2016 CERN TB Log pageback to Aug2016CERNTBAdd Log-- Koji Nakamura - 2016-08-11 |